Plan Review Notes
Plan Review Notes For Permit 13051110
Permit Number 13051110
Review Stop ENG
Sequence Number 2
Notes
Date Text
2013-10-22 17:06:38PLEASE RESPOND TO COMMENTS IN WRITING:
 #1 NO EXISTING OR PROPOSED DRAINAGE IS SHOWN:
 TYPICAL SURFACE WATER CRITERIA: SFWMD, APPLICANTS TREAT
 FIRST INCH OF RUNOFF OR 2 1/2 TIMES THE IMPERVIOUS
 AREA, WHICH EVER IS GREATER.
  
 #2 PROVIDE PROPOSED PERVIOUS AND IMPERVIOUS
 CALCULATIONS. THESE FIGURES WILL BE USED TO UPDATE
 STORM WATER ACCOUNT.
  
 NOTE: ABSENCE OF STORM WATER
 IN MANY PARTS OF THE CITY THE ABSENCE OF ANY STORMWATER
 BMP (STORMWATER BEST MANAGEMENT PRACTICES) IN SITES
 ALLOWS THE BOTH THE WATER VOLUME AND
 CONTAMINANT/POLLUTANT LOAD TO ENTER OUR SYSTEM
 UNTREATED. WHILE WE BELIEVE OUR EXISTING SYSTEM IS
 SUFFICIENT TO SERVICE THE STORMWATER VOLUME FOR YOUR
 PROPOSED USE; HOWEVER WE RECOGNIZE THAT THE FIRST FLUSH
 FROM THE IMPERVIOUS AREA CONTAINS 90% OF THE
 CONTAMINANT/POLLUTANT LOAD FROM RAIN EVENTS AND THIS
 LOADING IS TRANSFERRED TO THE CITY?S STORMWATER SYSTEM.
 ACCORDINGLY, THE CITY HAS THE AUTHORITY TO IMPOSE
 STORMWATER BMP?S ON THE ENTIRE SITE WITH OR WITHOUT THE
 PROGRESSION OF THE PROPOSED WORK. HOWEVER, IN
 CONSIDERATION OF THE SCOPE OF THE PROPOSED
 IMPROVEMENTS, THE CITY HAS THE AUTHORITY TO THROTTLE
 IMPLEMENTATION OF BMP?S. IN THIS CASE, OUR
 RECOMMENDATION IS THAT YOU AS THE PROPERTY OWNER SHALL
 DESIGN AND MODIFY THE EXISTING STORMWATER
 INFRASTRUCTURE SERVING THE EXISTING PAVED AREA THAT HAS
 BEEN IDENTIFIED BY THE PLANNING AND ZONING DEPARTMENT
 AS REQUIRED SUPPORTING YOUR CONSTRUCTION.
 ANY MODIFICATION SHALL INCORPORATE STORMWATER BMP?S
 SUFFICIENT TO DETAIN THE FIRST FLUSH FROM THE
 REFERENCED IMPERVIOUS AREA. OWNER MAY PROPOSE AN
 ISOLATED SYSTEM THAT DETAINS AND PERCOLATES. PLEASE
 REFER TO THE SOUTH FLORIDA WATER MANAGEMENT DISTRICT
 MANUAL, IT?S A GOOD GUIDE TO SEE THE OPTIONS THAT MAY
 WORK WITH YOUR SITE. PLEASE LOOK AT THE OPTIONS FOR
  
 NONSTRUCTURAL BMP?S AND STRUCTURAL BMP?S. WE BELIEVE
 ANY OF THESE MODIFICATIONS REFLECT REASONABLE
 IMPROVEMENTS TO THE EXISTING CONDITIONS AND ARE
 CONSISTENT WITH PRACTICES OF BOTH THE CITY AND SOUTH
 FLORIDAWATER MANAGEMENT DISTRICT.
 HTTP://WWW.SFWMD.GOV/PORTAL/PAGE/PORTAL/XREPOSITORY/SFW
 MD_REPOSITORY_PDF/BMP_MANUAL.PDF
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES AND PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822?1200
 DIRECT: (561) 494?1085
 FAX: (561) 494?1116
 MOBILE: (561) 644?7301
 EMAIL: [email protected]