| 2013-06-27 11:36:59 | 2010 FBC |
| | |
| | DENIED BY BUILDING |
| | |
| | 1) SUBMIT TWO COPIES OF PRODUCT APPROVALS FOR THE NEW |
| | WINDOWS AND DOORS AS REQUIRED BY DCA RULE 9N-3. |
| | |
| | 2) THE PRODUCT APPROVALS ARE REQUIRED TO BE REVIEWED |
| | AND APPROVED IN WRITING BY THE DESIGNER OF RECORD. CITY |
| | AMENDMENTS 107.3.4.1 |
| | |
| | 3) PROVIDE DETAILS THAT SHOW COMPLIANCE WITH FBC R312 |
| | FOR THE STAIR GUARDS (RAILS). |
| | |
| | 4) PROVIDE ADDITIONAL STRUCTURAL DETAILS FOR THE |
| | STAIRS. SPECIFY INTERMEDIATE SUPPORT, NUMBER OF |
| | STRINGERS, LANDING DIMENSIONS, ETC. |
| | |
| | 5) SHOW COMPLIANCE WITH FBCR 311.7.5 FOR STAIRWAY |
| | LANDINGS. |
| | |
| | 6) THE PLANS SPECIFY CDX PLYWOOD FOR THE RISERS ON THE |
| | EXTERIOR STAIRS. THIS DOES NOT COMPLY WITH R317 FOR |
| | PROTECTION OF WOOD AND WOOD PRODUCTS FROM DECAY. |
| | |
| | 7) THE DESIGN INFORMATION ON SHEET A1 IS NOT CORRECT. |
| | THE WIND SPEED IS 170 MPH NOT 167MPH. THE EXPOSURE |
| | CATEGORY IS C NOT B. THE CONSTRUCTION TYPE IS VB NOT V. |
| | FBC R301 |
| | |
| | 8) SHOW THE CONTINUOUS LOAD PATH FROM THE LOAD BEARING |
| | 4 X 4 POSTS ON THE 2ND FLOOR THROUGH THE FIRST FLOOR TO |
| | THE FOUNDATION. FBC R 601.2 |
| | |
| | 9) SHOW COMPLIANCE WITH FBC R302.3 FOR THE REQUIRED ONE |
| | HOUR FIRE-RESISTANCE RATING FLOOR/CEILING ASSEMBLY THAT |
| | SEPARATES THE TWO DWELLING UNITS. |
| | |
| | 10) SUBMIT ENERGY CALCULATIONS FOR THE TWO DWELLING |
| | UNITS THAT ARE BEING CHANGED FROM NONCONDITIONED SPACE |
| | TO CONDITIONED SPACE. FBC ENERGY SECTION 101.4.5 |
| | |
| | 11) SHOW COMPLIANCE WITH FBC ENERGY SECTION 402.2.12 |
| | FOR INSULATION IN THE FLOOR/CEILING ASSEMBLY BETWEEN |
| | THE TWO UNITS. |
| | |
| | 12) PROVIDE A DETAIL FOR THE WATER HEATER THAT IS |
| | LOCATED IN THE HVAC PLENUM. SHOW THE WATER HEATER PAN |
| | AND PAN DRAIN TERMINATING TO THE EXTERIOR OF THE |
| | BUILDING. FBCR P2801 |
| | |
| | 13) IT APPEARS THAT THE HVAC DUCT WORK FOR THE FIRST |
| | FLOOR WILL NEED TO BE INSTALLED UNDER THE FLOOR/CEILING |
| | ASSEMBLY IN A SOFFIT, BASED ON THE PLANS THAT WERE |
| | SUBMITTED. PLEASE REVIEW THE DESIGN AND CLARIFY HOW THE |
| | DUCTS WILL BE INSTALLED BELOW THE ONE HOUR FIRE RATED |
| | FLOOR/CEILING ASSEMBLY. CITY AMENDMENTS 107.2.1 |
| | |
| | PLEASE PROVIDE A RESPONSE LETTER INDICATING HOW EACH OF |
| | THE REVIEW COMMENTS WAS ADDRESSED. |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |