| Notes |
| Date |
Text |
| 2013-04-19 15:02:34 | VOLTAGE DROP CALCULATION DOES NOT SEEM TO MATCH | | | REQUIRED VOLTAGE RATING AND PROPOSED EQUUIPMENT. IS | | | ANNUNCIATION PHASED, 2 ABOVE AND ONE BELOW FLOOR OF | | | INITIATION? | | | ADDED MECHANICAL STOP FOR DUCT DETECTORS | | | DOES NOT APPEAR PULL STATIONS ARE LOCATED AT EACH POINT | | | OF NATURAL ESCAPE? RECREATION ROOM, MAINTENANCE ROOM | | | CALLED ENGINEER REGARDING VD. HE DID NOT HAVE THE | | | DRAWINGS AT THIS TIME. WILL REVIEW AND CALL ME BACK | | | SPOKE WITH DESIGN ENGINEER. CALCULATIONS AND VOLTAGES | | | APPEAR OK BASED ON CONVERSATION AND EXPECTED VOLTAGES | | | OF EQUIPMENT TO BE VERIFIED IN THE FIELD. BATTERY POWER | | | APPEARS TO BE SUFFICIENT BASED ON DRAW OF PROPOSED | | | DEVICES. SPOKE TO WESLEY ON PULL STATIONS AND THIS | | | SEEMS TO BE OK AS IT IS A SPRINKLERED BUILDING. | | | |
|