| Date |
Text |
| 2013-03-21 07:28:39 | ****CORRECTIONS**** |
| | SAMANTHA HILL, BUILDING PLANS EXAMINER |
| | 561-805-6724 [email protected] |
| | FBC FLORIDA BUILDING CODE 2010 |
| | FBC R FLORIDA BUILDING CODE 2010 RESIDENTIAL |
| | |
| | COMMENTS FROM PREVIOUS LIST: |
| | |
| | 1-2. OK |
| | |
| | 3. SPEC SHEET REFERS TO A NEW CLOSET AND DOOR, NOT |
| | SHOWN ON PLAN. CONFIRM THAT THIS HAS BEEN REMOVED FROM |
| | SCOPE OR REVISE PLAN TO SHOW ALL WORK PROPOSED, FBC |
| | 107. |
| | |
| | 4. OK |
| | |
| | 5. PROVIDE FLORIDA STATE OR LOCAL PRODUCT APPOVAL FOR |
| | THE FLAT DECK. PROVIDE ROOF HEIGHT AND SLOPE. FOR THE |
| | ROOF, INDICATE WHICH APPROVED ASSEMBLY IS PROPOSED AND |
| | PROVIDE ENGINEERING IF REQUIRED OR OTHERWISE SPECIFY |
| | ENHANCED FASTENING, SEE LIMITATIONS ON THE PRODUCT |
| | APPROVAL. A SEPARATE ROOF SUB PERMIT IS REQUIRED. |
| | |
| | PLEASE NOTE THAT INSULATION BOARD IS REQUIRED PER |
| | SPECIFICATION. |
| | |
| | ROOF INFORMATION MAY BE PROVIDED UNDER A SEPARATE STAND |
| | ALONE PERMIT. PLEASE ADVISE IF YOU WISH FOR THIS SCOPE |
| | TO BE REMOVED FROM THIS PERMIT. |
| | |
| | 2ND REVIEW, TWO DIFFERENT ASSEMBLIES HIGHLIGHTED |
| | (SHEETS 8 AND 11), SEE GENERAL LIMITATION #7, |
| | CALCULATIONS IN ACCORDANCE WITH RAS 117 TO BE |
| | CALCULATED BY AN ARCHITECT, ENGINEER, OR REGISTERED |
| | ROOF CONSULTANT, FBC R 301. |
| | |
| | 6-7. OK |
| | |
| | NEW COMMENT: |
| | |
| | ENGINEER'S SEAL TO BE IN ACCORDANCE WITH FBPE BOARD |
| | RULES, FS 471, FAC61G-15.23. SEAL TO STATE "LICENSE" |
| | RATHER THAN "CERTIFICATE" (RULE CHANGED SEVERAL YEARS |
| | AGO). |
| | |
| | IT IS NOT CLEAR WHETHER THE ENGINEER IS WORKING THROUGH |
| | THE COMPANY GLADES ROOFING LLC. ENGINEER'S LETTER |
| | APPROVING PRODUCT APPROVALS IS NOT SEALED AND IS ON |
| | GLADES ROOFING LLC'S LETTERHEAD. IF THE ENGINEER IS |
| | PRACTICING ENGINEERING THROUGH THIS COMPANY, A |
| | CERTIFICATE OF AUTHORIZATION IS REQUIRED FS471. IF THE |
| | ENGINEER IS NOT, EITHER PROVIDE THE LETTER ON THE |
| | ENGINEER'S LETTERHEAD OR EXPLAIN WHY THE ENGINEER IS |
| | USING THE CONTRACTOR'S LETTERHEAD FOR BUILDING |
| | SPECIFICATIONS. |
| | |
| | ENERGY CALCS NOT SIGNED AND ARE LACKING THE HEATING |
| | EQUIPMENT INFORMATION. |
| | |
| | NEW COMMENT: |
| | |
| | UPON REQUEST, OUTSTANDING ITEMS CAN BE PROVISO ITEMS |
| | (REVISION REQUIRED PRIOR TO FIRST INSPECTION). PERMIT |
| | WILL BE ISSUED AT CONTRACTOR'S RISK. |
| | |
| | |
| | |
| | |
| | |