| 2013-02-05 10:13:06 | FBC 2010 EXISTING BUILDING CODE |
| | FBC 2010 ACCESSIBILITY CODE |
| | FBC 2010 PLUMBING REVIEW #1 |
| | DENIED: |
| | |
| | 1. THE BAR EQUIPMENT (HAND SINKS, ICE BINS, FLOOR |
| | DRAINS, BEER RINSE, ETC.) ARE NOT REQUIRED TO BE |
| | CONNECTED TO THE GREASE SYSTEM. PLEASE CONNECT TO THE |
| | SANITARY. PLEASE LEAVE THE KITCHEN ON THE INTERCEPTOR. |
| | FBC 2010 PLUMBING 2010 1003.2 APPROVAL: |
| | .....WASTES THAT DO NOT REQUIRE TREATMENT OR SEPARATION |
| | SHALL NOT BE DISCHARGED INTO ANY INTERCEPTOR OR |
| | SEPARATOR. |
| | |
| | 2. A VENT IS REQUIRED BETWEEN THE LAST 2 WATER CLOSETS |
| | (THE H.C. CLOSETS) ON THE CIRCUIT VENT SYSTEM. |
| | 911.2 VENT CONNECTION. |
| | THE CIRCUIT VENT CONNECTION SHALL BE LOCATED BETWEEN |
| | THE TWO MOST UPSTREAM FIXTURE DRAINS. THE VENT SHALL |
| | CONNECT TO THE HORIZONTAL BRANCH AND SHALL BE INSTALLED |
| | IN ACCORDANCE WITH SECTION 905. THE CIRCUIT VENT PIPE |
| | SHALL NOT RECEIVE THE DISCHARGE OF ANY SOIL OR |
| | WASTE.911.2 VENT CONNECTION. |
| | |
| | 3. SHEET P1.1 THE COLD WATER MAIN WILL BE REQUIRED TO |
| | BE 1" TO THE LAST FIXTURE IN THE RESTROOMS PER TABLE |
| | 603.1 (OR PLEASE SHOW ALL FLOW CALCULATIONS ON PLAN). |
| | 604.1 GENERAL. |
| | THE DESIGN OF THE WATER DISTRIBUTION SYSTEM SHALL |
| | CONFORM TO ACCEPTED ENGINEERING PRACTICE. METHODS |
| | UTILIZED TO DETERMINE PIPE SIZES SHALL BE APPROVED. |
| | |
| | 4. PLEASE INCLUDE THE LOCATION AND SIZE OF THE WATER |
| | HEATER. |
| | 107.3.5.1.3 PLUMBING 5. WATER HEATERS |
| | |
| | |
| | REVIEW BY |
| | LARRY WAGNER |
| | CHIEF PLUMBING INSPECTOR |
| | PHONE # 805-6692 |
| | EMAIL [email protected] |
| | FAX # 805-6676 |
| | |