| Plan Review Notes For Permit 12120605 |
| Permit Number |
12120605 |
|
| Review Stop |
M |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2012-12-26 16:12:14 | *** MECHANICAL CORRECTIONS NEED *** | | | | | | 1) CEILING HEIGHT IS TOO HIGH FOR THE EXHAUST VENTS. | | | SEE 2010 FBC/M TABLE 403.3 NOTE (H). FOR NAIL SALONS, | | | THE REQUIRED EXHAUST SHALL INCLUDE VENTILATION TABLES | | | OR OTHER SYSTEMS THAT CAPTURE THE CONTAMINANTS AND | | | ODORS AT THEIR SOURCE AND ARE CAPABLE OF EXHAUSTING A | | | MINIMUM OF 50 CFM PER STATION. | | | | | | 2) PLAN M-1 OUTSIDE AIR 500 CFM'S APPEAR TO BE TO LOW, | | | SEE ASHRAE STANDARD 62.1-2007, 6.2.2.1 & TABLE 6-1 FOR | | | MORE DETAILED INFORMATION REGARDING OUTDOOR AIR | | | CALCULATIONS, OR FBC/M 403.3. PLEASE SHOW OUTDOOR AIR | | | CALCULATIONS ON MECHANICAL PLAN. | | | | | | 3) PLAN M-1 MECHANICAL VENTILATION CALCULATIONS SHOWS, | | | EXHAUST FOR NAIL STATIONS 50 CFM'S PER NAIL STATION. | | | THIS IS THE MINIMUM, SEE 2010 FBC/M TABLE 403.3 EXHAUST | | | AIRFLOW COLUMN (0.6 CFM'S PER SQUARE FOOT). PLEASE | | | CORRECT. | | | | | | 4) PLAN M-1 AIR BALANCE SUMMARY, SHOWS THE BUILDING AT | | | 0 PRESSURE. PER 2010 FBC/ENERGY 503.2.10.6 BUILDING | | | PRESSURES. MECHANICAL SYSTEMS SHALL BE DESIGNED TO | | | ASSURE THAT BUILDINGS ARE PRESSURIZED WITH RESPECT TO | | | OUTDOORS. | | | | | | MECHANICAL PLAN REVIEW BY: | | | TOM GORDON (HY-BYRD INC.) (561) 805-6732 |
|