2012-12-19 10:31:45*** CORRECTIONS NEEDED FOR MECHANICAL REVIEW ***
  
 1) SUBMIT ENERGY CALCULATIONS, SEE 2010 FBC/ENERGY
 401.2 & 405.4.2.
  
 2) SUBMIT COOLING LOAD CAL'S., SEE 2010 FBC/ENERGY
 403.6.1.
  
 3) SUBMIT DUCT DESIGN CAL'S. MANUAL D OR OTHER APPROVED
 METHODS, SEE 2010 FBC/RES. M1601.1.
  
 4) EQUIPMENT LISTING ON PLAN M1.0 SHOWS ALL THREE A/C
 SYSTEMS AS UNIT #1, PLEASE CORRECT, PER 2010 CITY OF
 WPB AMEND. 107.2.1 & 107.3.5.3 .
  
 5) PLAN M1.0 SHOWS RETURN AIR GRILL NOT RETURNING TO
 AHU #3, PLEASE CORRECT PER 2010 FBC/RES. M1602.4.
  
 6) PLAN M1.0 SHOWS RETURN AIR GRILL RETURNING TO THE
 SUPPLY SIDE OF AHU #2, PLEASE CORRECT PER 2010 FBC/RES.
 M1602.4.
  
 7) PLEASE SUBMIT DETAILED MANUFACTURER'S
 SPECIFICATION'S AND INSTALLATION INSTRUCTIONS FOR
 RANGE/OVEN IN THE OUTDOOR BBQ SPACE. SEE 2010 FBC/RES.
 M1901.1 & M1901.2.
  
 8) SUBMIT COMBUSTION AIR CALCULATIONS AND MAKE UP AIR
 FOR THE GAS CLOTHES DRYER, AND THE GAS WATER HEATER OR
 PROVIDE FOR COMBUSTION AIR, SEE 2010 FBC/RES. G2407.1.
  
 MECHANICAL PLAN REVIEW BY:
 TOM GORDON (HY-BYRD INC.) (561) 805-6732


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved