| Plan Review Notes For Permit 12100036 |
| Permit Number |
12100036 |
|
| Review Stop |
ENG |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2012-10-12 11:39:20 | 1. APPLICATION DRAWING REPRESENTS THE REMOVAL OF THE | | | EASTERN DRIVEWAY APRON. DRAWING SHALL INCLUDE MATERIAL | | | TO BE PLACE AFTER DRIVEWAY REMOVAL. (I.E. SOD) | | | 2. REMIANING DRIVEWAY APRON DOES NOT ALIGN WITH | | | PROPOSED DRIVEWAY. THE PROPOSED 20' DRIVEWAY WILL ALLOW | | | FOR A MAXIMUM 26' APRON AND MUST BE ALIGNED WITH THE | | | DRIVEWAY. | | | 3. ARE PAVER BRICKS PROPOSED FOR THE APRON AS WELL AS | | | THE DRIVEWAY? IF PAVER BRICKS ARE PROPOSED FOR THE | | | APRON, A MATERIAL CUT SHEET FOR THE BRICKS MUST BE | | | SUBMITTED. | | | 4. IF PAVER BRICKS ARE UTILIZED IN THE APRON, A | | | DRIVEWAY AGREEMENT MUST BE EXECUTED AND RECORDED WITH | | | THE CLERK/COMPTROLLERS OFFICE. AGREEMENT MAY BE | | | OBTAINED ON THE CITY'S WEB PAGE AT | | | HTTP://WWW.CITYOFWPB.COM/ENGINEERING/ENG_FORMS.PHP | | | 5. A TREE IS PROPOSED TO BE REMOVED TO ACCOMODATE THE | | | EXPANSION OF THE DRIVEWAY. THE TREE MUST BE REPLACED IN | | | ACCORDANCE WITH THE CITY'S STANDARDS FOR CONSTRUCTION | | | AND USE OF PUBLIC RIGHTS-OF-WAY AND EASEMENTS. | | | | | | BRIAN R. MOREE | | | ENGINEERING CONSTRUCTION MANAGER |
|