| Plan Review Notes For Permit 12090646 |
| Permit Number |
12090646 |
|
| Review Stop |
P |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2012-10-22 15:48:36 | FBC 2010 PLUMBING REVIEW #1 | | | DENIED: | | | | | | 1. THE FIXTURES FOR THE 2ND FLOOR BATH #3 ARE RUNNING | | | THROUGH THE MASTER BATH WET VENT ON THE FIRST FLOOR. | | | THE 2ND FLOOR WASHING MACHINE AND LAUNDRY TUB ARE | | | RUNNING THROUGH THE FIRST FLOOR WET VENT FOR THE POWDER | | | ROOM. | | | P3108.1 HORIZONTAL WET VENT PERMITTED. | | | ANY COMBINATION OF FIXTURES WITHIN TWO BATHROOM GROUPS | | | LOCATED ON THE SAME FLOOR LEVEL ARE PERMITTED TO BE | | | VENTED BY A HORIZONTAL WET VENT. | | | | | | REVIEW BY | | | LARRY WAGNER | | | CHIEF PLUMBING INSPECTOR | | | PHONE # 805-6692 | | | EMAIL [email protected] | | | FAX # 805-6676 | | | |
|