| 2012-09-26 15:56:55 | RESIDENTIAL (R3) ADDITION MECHANICAL REVIEW COMMENTS. |
| | CODE: 2010 FBC. |
| | |
| | 1- REVISE EQUIPMENT SIZING CALCULATIONS. SEC. 107.2.1 |
| | CITY AMENDMENTS TO FBC: |
| | A) THERE ARE TWO DIFFERENT ADDITIONS. ONE IS THE |
| | BATHROOM ON THE MAIN HOUSE AND THE OTHER ONE IS THE |
| | SEPARATE INDEPENDENT GUEST BEDROOM/BATHROOM. IT LOOKS |
| | LIKE THE EQUIPMENT SIZING IS FOR THE GUEST STRUCTURE |
| | ONLY. THEREFORE, THE AREA TO BE CONSIDERED NEEDS TO BE |
| | REVISED. IT'S NOT 308 S.F. |
| | |
| | B) CLARIFY THE HEATING EQUIPMENT SUMMARY. WHY THE |
| | HEATING INPUT AND OUTPUT IS 37,658 BTUH. THIS IS NOT |
| | WHAT IS SHOWN N THE ENERGY CALCULATIONS EITHER. |
| | |
| | C) SPECIFY ALL THE EQUIPMENT. SPECIFY THE AIR HANDLER |
| | UNIT AND THE CONDENSER UNIT.. |
| | |
| | D) COORDINATE ALL THE INFORMATION WITH THE ENERGY |
| | CALCULATIONS. |
| | |
| | E) COORDINATE AL THE INFORMATION WITH THE EQUIPMENT |
| | INFORMATION SHOWN ON THE MECHANICAL PLAN M-1. ALL THE |
| | INFORMATION NEED TO MATCH. EQUIPMENT MODELS, HEATING |
| | INFORMATION, COOLING INFORMATION, SEER, ELECTRICAL |
| | REQUIREMENTS, ETC. |
| | |
| | F) ARCHITECT TO COORDINATE EQUIPMENT ELECTRICAL |
| | REQUIREMENTS WITH THE ELECTRICAL PLAN. ELECTRICAL PLAN |
| | DOESN'T SHOW ELECTRICAL REQUIREMENTS FOR THE AIR |
| | HANDLER UNIT. REVISE AS REQUIRED. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CALL |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |