| Date |
Text |
| 2012-09-20 15:31:11 | FAILED |
| | |
| | PLEASE RESPOND IN WRITING. PLEASE NOTE THAT THE PLANS |
| | HAVE BEEN MARKED WITH THE COMMENTS. ALL CORRECTIONS |
| | SHALL BE REFLECTED ON ALL PLANS, REGARDLESS IF THEY |
| | INCLUDE NOTES. |
| | |
| | 1) SITE LAYOUT AND ELEVATIONS HAVE CHANGED. THE FINAL |
| | AS-BUILT PLANS NEED TO BE SUBMITTED AS A MINOR SITE |
| | PLAN AMENDMENT TO THE PLANNING DIVISION. |
| | |
| | 2) THE RELOCATED SIDEWALK, SOUTH OF THE VISITOR |
| | BUILDING LEADING TO THE MAIN POWER BLOCK, HAS BEEN |
| | SHIFTED TO THE WEST FROM THE ORIGINALLY APPROVED PLANS. |
| | THIS RESULTS IN THE INTERIOR LANDSCAPE ISLANDS NOT |
| | HAVING SUFFICIENT WIDTH TO SUPPORT THE REQUIRED TREES. |
| | |
| | 3) HOW WILL THE FOOTER AND SUPPORT POST ALLOW FOR THE |
| | INSTALLATION OF THE REQUIRED TREES IN THE TERMINAL |
| | PARKING ISLANDS? THE ACCURATE DIMENSIONS NEED TO BE |
| | SHOWN ON THE SITE AND LANDSCAPE PLANS. THE SUPPORT |
| | POSTS SHOWN ON SHEET 710-A5-101 DO NOT MATCH THE |
| | FOOTPRINT ON THE SITE PLAN. |
| | |
| | 4) HOW WILL THE AIR CONDITION UNITS BE SCREENED? |
| | |
| | 5) CHECK THE DIMENSIONS IN THE NORTHEAST CORNER OF THE |
| | PARKING LOT. THEY DO NOT SEEM TO SCALE WITH WHAT IS |
| | SHOWN. |
| | |
| | 6) WHAT IS THE 16 FOOT MEASUREMENT SHOWING AT THE |
| | PHOTOVOLTAIC CARPORTS? |
| | |
| | 7) LIGHT POLE LOCATIONS SHALL NOT INTERFERE WITH |
| | PARKING LOT TREES. STAFF WILL NOT APPROVE THE SITE |
| | LIGHTING UNTIL THE LANDSCAPE PLAN IS SUBMITTED FOR |
| | REVIEW TO ENSURE NO CONFLICTS. PLEASE NOTE THAT SITE |
| | LIGHTING REQUIRES A SEPARATE PERMIT. |
| | |
| | 8) SIGNAGE AND PARKING LOT STRIPING REQUIRE SEPARATE |
| | PERMITS. |
| | |
| | CONTACT ERIC SCHNEIDER @ (561) 822-1446 |
| | |
| | |
| | |