Plan Review Notes
Plan Review Notes For Permit 12060789
Permit Number 12060789
Review Stop Z
Sequence Number 2
Notes
Date Text
2012-09-10 18:42:58PLANNING: **** PASSED WITH PROVISO, A LANSCAPE PERMIT
 SHALL BE SUBMITTED AND APPROVED, PRIOR TO ANY ZONING
 INSPECTIONS.
  
 FDOT APPROVAL IS REQUIRED, PRIOR TO ANY
 ZONING/BUILDING/ENGINEERING INSPECTIONS FOR THE SITE
 WORK ON FDOT RIGHT-OF-WAY SINCE DRIVEWAY RE-DESIGN AND
 APRON IS BEING NARROWED CONSISTENT WITH THE DRIVEWAY.
 PROOF OF AN FDOT PERMIT IS REQUIRED TO BE SUBMITTED
  
  
 1. RESPOND TO COMMENTS IN WRITING.
  
 2. PROVIDE TWO (2) COPIES OF A CURRENT SURVEY, WHICH
 INCLUDES THE PROPERTY'S ADDRESS AND LEGAL DESCRIPTION.
  
 3. A SEPARATE PERMIT IS REQUIRED FOR THE WALL SIGN AND
 FREE STANDING BUILDING. INCLUDE COST ESTIMATE FOR THE
 SCOPE OF WORK.
  
 4. SEPARATE LANDSCAPE AND IRRIGATION PERMITS ARE
 REQUIRED. TWO COPIES OF THE LANDSCAPE PLAN AND A
 CERTIFIED COST ESTIMATE THAT INCLUDES THE TOTAL COST OF
 ALL LANDSCAPE MATERIALS AND LABOR, BROKEN DOWN INTO
 UNIT COST SHALL BE SUBMITTED WITH THE LANDSCAPE PERMIT
 APPLICATION. SEE COMMENT NUMBER 3.
  
 5. SUBMIT TWO COPIES OF THE IRRIGATION PLAN WITH THE
 IRRIGATION PERMIT APPLICATION.
  
 ANY OUTSTANDING PPRC COMMENTS WILL NEED TO BE ADDRESSED
 PRIOR TO FINAL APPROVAL OF THE BUILDING PERMIT.
  
  
 IF YOU HAVE ANY QUESTIONS PLEASE CONTACT ME.
  
 LINDA MIA FRANCO, AICP
 SENIOR PLANNER
 PLANNING DIVISION
 TEL: (561) 822-1443
 EMAIL: [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved