| 2012-06-01 11:06:59 | COMMENTS: |
| | |
| | 1. PIPING COMING OUT OF GARAGE CONNECTING TO STRUCTURE |
| | THAT WILL BE REMOVED IS NOT SHOWN. |
| | 2. CITY OF WPB WOULD LIKE FOR YOU TO REPLACE THE 12" |
| | DIAMETER PIPE PORTION TO THE NEXT UP STREAM STRUCTURE. |
| | EXISTING 12" STEEL PIPE APPEARS TO BE OLD. CITY WOULD |
| | ACCEPT SAME SIZE REINFORCED CONCRETE PIPE SIZE IN IT'S |
| | REPLACEMENT TO AVOID UPSIZING OF EXISTING STRUCTURES. |
| | 3. TYPE S-II ASPHALT MIX IS NOT USED BY THE CITY OF |
| | WPB. FOR WEARING (SURFACE) COURSES |
| | SURFACE COURSES ARE TO BE OF ASPHALTIC CONCRETE |
| | CONSTRUCTION IN ONE OR TWO LIFTS AS DETERMINED BY |
| | THE ENGINEERING SERVICES DEPARTMENT. |
| | BOTTOM COURSE - 1" THICK (D.O.T.) TYPE S-III |
| | TOP COURSE - 1" THICK TYPE S-III |
| | A TACK COAT SHALL BE USED BETWEEN PAVING COURSES, AND A |
| | PRIME COAT SHALL BE USED ON THE FINISHED |
| | ROCK BASE. |
| | 4. CONTRACT MUST FOLLOW NPDES REQUIREMENTS FOR |
| | POLLUTION CONTROL. INCLUDE NOTES TO PROTECT CATCH |
| | BASINS. |
| | 5. SIDEWALK RAMPS CONNECTING DO NOT MEET ADA NOR DO YOU |
| | ADDRESS THEM WITH THE RAISED TRUNCATED DOMES |
| | AS PER FDOT INDEX 304. |
| | 6. STOP BAR AND DIVIDE YELLOW MUST BE THERMOPLASTIC. |
| | 7. EXISTING CONFLIC STRUCTURE MUST BE CLEANED OF DEBRIS |
| | SILT FROM CONSTRUCTION ON-SITE. PROVIDE PROTECTION AS |
| | THIS OUTFALL EVENTUALLY REACHES. INTRACOASTAL. |
| | |
| | THE FOLLOWING GERENAL NOTES APPLY TO THE PROJECT: |
| | |
| | BEST MANAGEMENT PRACTICES (BMPS) |
| | BEST MANAGEMENT PRACTICES (BMPS) MEANS SCHEDULES OF |
| | ACTIVITIES, PROHIBITIONS OF PRACTICES, |
| | MAINTENANCE PROCEDURES, AND OTHER MANAGEMENT PRACTICES |
| | TO PREVENT OR REDUCE POLLUTION INTO THE |
| | TOWN'S STORM WATER COLLECTION SYSTEM AND THENCE TO THE |
| | WATERS OF THE UNITED STATES. BMPS ALSO |
| | INCLUDE PRACTICES TO CONTROL FACILITY SITE RUNOFF, |
| | SPILLAGE OR LEAKS, SLUDGE OR WASTE DISPOSAL, OR |
| | DRAINAGE FROM RAW MATERIAL STORAGE. |
| | |
| | COMPLETION OF WORK |
| | UNTIL THE RIGHT-OF-WAY IS FULLY RESTORED TO ORIGINAL OR |
| | BETTER CONDITION FOLLOWING |
| | CONSTRUCTION/EXCAVATION ACTIVITIES THE RESTORATION IS |
| | NOT COMPLETE AND THE ASSOCIATED PERMIT MAY |
| | NOT BE CLOSED. THIS CONDITION INCLUDES RESTORATION OF |
| | SIDEWALKS, MEDIANS, AND ROADS. |
| | |
| | DEWATERING |
| | PERMIT APPLICATIONS FOR DEWATERING MUST STATE THE |
| | PURPOSE OF THE DEWATERING REQUEST; I.E., |
| | CONSTRUCTION OF A NEW SWIMMING POOL, SWIMMING POOL |
| | REPAIR/RESURFACING, EXCAVATION FOR SUBGRADE |
| | CONSTRUCTION, UNDERGROUND UTILITY REPAIR, ETC. NO WATER |
| | MAY BE DISCHARGED DIRECTLY ONTO THE |
| | STREET. ALL WATER MUST BE DISCHARGED THROUGH A CLOSED |
| | CONDUIT AND/OR FLEXIBLE HOSE TO A DISCHARGE |
| | POINT DESIGNATED BY THE ENGINEERING SERVICES |
| | DEPARTMENT. PUMPING SYSTEMS MUST BE FLUSHED ONSITE |
| | TO PRODUCE ONLY CLEAR WATER BEFORE BEING CONNECTED TO |
| | THE DISCHARGE SYSTEM LEADING TO THE |
| | CITY STORM WATER SYSTEM. WATER USED TO FLUSH THE SYSTEM |
| | MUST BE RETAINED ON-SITE. AN |
| | ENGINEERING SERVICES DEPARTMENT CONSTRUCTION |
| | COORDINATOR MUST BE ON THE JOB SITE TO OBSERVE |
| | START-UP OF DEWATERING DISCHARGE TO THE CITY STORM |
| | WATER SYSTEM. |
| | |
| | WATER DISCHARGING TO THE CITY STORM DRAINAGE SYSTEM OR |
| | DIRECTLY INTO THE INTRACOASTAL WATERWAY |
| | MUST MEET ALL APPLICABLE FEDERAL, STATE AND LOCAL WATER |
| | QUALITY STANDARDS. THE CONTRACTOR SHALL BE |
| | RESPONSIBLE TO CLEAN ANY CITY STRUCTURES OR PIPES INTO |
| | WHICH DIRT AND DEBRIS WASHES. FINES LEVIED |
| | BY ANY REGULATORY AGENCY, DUE TO A CONTRACTOR'S |
| | PERMITTED OR UNPERMITTED ACTIVITY, SHALL BE PAID BY |
| | SAID CONTRACTOR WHOSE OPERATION CAUSED THE VIOLATION. |
| | |
| | MINIMUM DESIGN CRITERIA |
| | AS A MINIMUM, ROADS AND/OR STREETS AND RELATED |
| | FACILITIES SHALL BE DESIGNED IN SUBSTANTIAL |
| | ACCORDANCE WITH THE LATEST EDITION OF THE "MANUAL OF |
| | MINIMUM STANDARDS FOR DESIGN, |
| | CONSTRUCTION AND MAINTENANCE FOR STREETS & HIGHWAYS" |
| | AND THE UTILITY ACCOMMODATION GUIDE, |
| | AS PUBLISHED BY THE STATE OF FLORIDA, AND THE |
| | PROVISIONS OF THE CITY OF WEST PALM BEACH MINIMUM |
| | CONSTRUCTION STANDARDS. |
| | |
| | TEMPORARY FACILITIES |
| | TEMPORARY FACILITIES, UNRELATED TO ANY ON-GOING |
| | CONSTRUCTION IN THE RIGHT-OF-WAY, AND INTENDED TO |
| | PROVIDE AN ESSENTIAL SERVICE FOR A PERIOD OF TIME NOT |
| | TO EXCEED ONE YEAR, MAY BE CONSTRUCTED IN THE |
| | RIGHT-OF-WAY, CONTINGENT UPON ENGINEERING SERVICES |
| | DEPARTMENT APPROVAL OF PROJECT PLANS AND |
| | SPECIFICATIONS, AND ISSUANCE OF A RIGHT-OF-WAY PERMIT. |
| | THERE WILL BE NO RELAXATION OF SAFETY |
| | REQUIREMENTS, BUT LIGHTER DUTY CONSTRUCTION WILL BE |
| | ALLOWED, WHERE PUBLIC INTERESTS WILL NOT SUFFER. |
| | IN CASES WHERE TEMPORARY FACILITIES MUST BE CONSTRUCTED |
| | TO PROVIDE OR MAINTAIN AN ESSENTIAL FEATURE |
| | AROUND PORTIONS OF A PUBLIC RIGHT-OF- WAY FOR PUBLIC |
| | SAFETY OR CONVENIENCE DURING CONSTRUCTION, |
| | SUCH TEMPORARY FACILITY MUST BE CLEARLY DRAWN IN |
| | SUFFICIENT DETAIL ON STANDARD SIZE DRAFTING SHEETS, |
| | AND SUBMITTED TO THE ENGINEERING SERVICES DEPARTMENT |
| | FOR REVIEW AND APPROVAL PRIOR TO |
| | IMPLEMENTATION. |
| | |
| | SUBGRADES |
| | ALL MATERIAL SUPPORTING THE ROADWAY AND SHOULDERS SHALL |
| | HAVE A MINIMUM LBR OF 40. THE |
| | SUBGRADE SHALL BE COMPACTED TO 98% OF MAXIMUM DRY |
| | DENSITY AS PER AASHTO T180. WHERE |
| | UNSUITABLE MATERIALS EXIST BELOW A PROPOSED ROADWAY, |
| | DEMUCKING OR INSTALLATION OF FILTER FABRIC |
| | WILL BE REQUIRED TO PROVIDE ADEQUATE SUPPORT OF THE |
| | ROADWAY. |
| | STABILIZED SUBGRADES WILL BE CONSIDERED FOR FULL DEPTH |
| | ASPHALT BASES OR FOR BASES LESS THAN 8INCHES |
| | THICK UPON RECOMMENDATION OF A REGISTERED PROFESSIONAL |
| | ENGINEER. |
| | |
| | MATERIAL |
| | LIMEROCK OR CRUSHED CONCRETE BASES SHALL BE TEN INCHES |
| | (10") THICK. LIMEROCK OF THE MIAMI |
| | FORMATION SHALL BE USED, HAVING A MINIMUM PERCENTAGE OF |
| | CARBONATES OF CALCIUM AND MAGNESIUM |
| | OF 70, UNLESS OTHERWISE APPROVED. CRUSHED CONCRETE |
| | SHALL HAVE A MAXIMUM SIZE OF 1INCHES . FULL DEPTH |
| | ASPHALT BASE WILL BE CONSIDERED UPON RECOMMENDATION OF |
| | A REGISTERED PROFESSIONAL ENGINEER. NO |
| | OTHER BASE MATERIAL IS ALLOWED. |
| | BASE DENSITY REQUIREMENTS |
| | BASE MATERIAL SHALL BE COMPACTED TO A DENSITY OF NOT |
| | LESS THAN 98% OF MAXIMUM DRY DENSITY AS |
| | DETERMINED BY AASHTO T-180 UNDER ALL PAVED AREAS. |
| | BASE COURSE CONSTRUCTION SHALL NOT BE STARTED UNTIL ALL |
| | UNDERGROUND CONSTRUCTION IN THE VICINITY HAS |
| | BEEN TESTED AND ACCEPTED. |
| | |
| | WEARING (SURFACE) COURSES |
| | SURFACE COURSES ARE TO BE OF ASPHALTIC CONCRETE |
| | CONSTRUCTION IN ONE OR TWO LIFTS AS DETERMINED BY |
| | THE ENGINEERING SERVICES DEPARTMENT. |
| | BOTTOM COURSE - 1INCHES THICK (D.O.T.) TYPE S-III TOP |
| | COURSE - 1INCHES THICK TYPE S-III |
| | A TACK COAT SHALL BE USED BETWEEN PAVING COURSES, AND A |
| | PRIME COAT SHALL BE USED ON THE FINISHED |
| | ROCK BASE. |
| | |
| | WEARING COURSES SHALL NOT BE PLACED UNTIL ALL |
| | UNDER-GROUND UTILITIES ARE INSTALLED AND ACCEPTED, |
| | AND, WHEN REQUESTED, A FINISHED ROCK SURVEY HAS BEEN |
| | SUBMITTED TO THE ENGINEERING SERVICES |
| | DEPARTMENT AND ACCEPTED. |
| | |
| | CURB/GUTTER |
| | ALL CURB ELEMENTS SHALL HAVE A FOUNDATION OR "PAD" WITH |
| | A MINIMUM LBR RATIO OF 70 AND SHALL BE |
| | AT LEAST 4INCHES IN THICKNESS, EXTENDING 6INCHES (MIN.) |
| | BEYOND THE EDGES OF THE CONCRETE, COMPACTED TO 98% |
| | OF MAXIMUM DENSITY, PER AASHTO T-180, UNLESS OTHERWISE |
| | APPROVED. |
| | |
| | ALL DRAINAGE PIPE INSTALLATIONS IN RIGHTS-OF- WAYS AND |
| | EASEMENTS SHALL BE OF REINFORCED CONCRETE, |
| | CONFORMING TO ASTM SPECIFICATION C. THE MINIMUM SIZE |
| | PIPE TO BE USED SHALL BE 15INCHES DIAMETER. |
| | PERFORATED CORRUGATED ALUMINUM PIPE WILL NOT BE |
| | ALLOWED. |
| | |
| | ALL DRAINAGE PIPE IN THE PUBLIC RIGHT-OF-WAY SHALL HAVE |
| | A MINIMUM OF 24INCHES OF COVER. |
| | ANY GRASSED AREAS DISTURBED BY CONSTRUCTION OR |
| | MAINTENANCE ACTIVITIES SHALL BE SODDED TO EQUAL OR |
| | BETTER CONDITION THAN THAT WHICH EXISTED PRIOR TO THE |
| | PERMITTED ACTIVITY. |
| | RESTORATION |
| | |
| | THE ENTIRE WORK AREA UTILIZED FOR THE PERFORMANCE OF |
| | ANY PERMITTED WORK SHALL BE RESTORED BY THE |
| | PERMITTEE. |
| | |
| | "RECORD" DRAWINGS & CERTIFICATIONS |
| | IF REQUIRED, "RECORD" DRAWINGS OF THE FINISHED ROCK |
| | BASE MUST BE SUBMITTED TO THE ENGINEERING |
| | SERVICES DEPARTMENT FOR APPROVAL BEFORE PROCEEDING WITH |
| | ASPHALT PAVEMENT. THESE DRAWINGS |
| | MUST BE SIGNED AND SEALED BY A LAND SURVEYOR REGISTERED |
| | IN THE STATE OF FLORIDA, AND MUST SHOW |
| | FINISHED ROCK BASE ELEVATIONS AND OFFSETS AT CENTER |
| | LINE, EDGE OF PAVEMENT, PLUS ELEVATIONS OF |
| | BOTTOM OF SWALE OR FLOW LINE OF GUTTER, TOP OF CURB AND |
| | RIGHT-OF- WAY LINE, AT HIGH AND LOW POINTS, |
| | INTERSECTIONS AND BREAKS IN GRADE. CERTIFIED LETTER AND |
| | PLAN UPON COMPLETION, CAD AND PDF DISK |
| | REQUIRED. |
| | |
| | COMPACTION MUST BE VERIFIED BY AN INDEPENDENT CERTIFIED |
| | ENGINEERING TESTING LABORATORY BY |
| | MAKING FIELD DENSITY TESTS OF EACH LAYER OF COMPACTED |
| | MATERIAL AT PRESCRIBED INTERVALS BEFORE THE |
| | SUCCEEDING LAYER IS PLACED |
| | FINAL INSPECTION AND ACCEPTANCE |
| | AFTER CONSTRUCTION IS COMPLETED AND ALL CERTIFICATIONS, |
| | RECORD DRAWINGS AND OTHER REQUIRED |
| | DOCUMENTS HAVE BEEN SUBMITTED TO THE ENGINEERING |
| | SERVICES DEPARTMENT, AND ACCEPTED, BUT |
| | BEFORE THE ONE-YEAR BONDED MAINTENANCE PERIOD BEGINS, |
| | THE PERMITTEE SHALL REQUEST A FINAL |
| | INSPECTION OF THE PROJECT. THE ENGINEERING SERVICES |
| | DEPARTMENT AND ALL OTHER INTERESTED PARTIES |
| | SHALL JOINTLY PERFORM SUCH INSPECTION TO DETERMINE THE |
| | ACCEPTABILITY OF THE PROJECT FOR |
| | MAINTENANCE. FOLLOWING THE INSPECTION, ANY NOTED |
| | DEFECTS WILL BE CORRECTED BY THE PERMITTEE, |
| | AFTER WHICH THE ENGINEERING SERVICES DEPARTMENT AND |
| | OTHER MAINTAINING AGENCIES, WILL ISSUE A |
| | NOTICE OF ACCEPTANCE. THIS WILL MARK THE START OF THE |
| | ONE-YEAR WARRANTEE PERIOD. |
| | PERMANENT PAVEMENT MARKINGS (CITY ROW) |
| | PERMANENT PAVEMENT MARKINGS SHALL CONSIST OF |
| | ALKYD-BASED THERMOPLASTIC OR INLAID PREFORMED |
| | PLASTIC MATERIAL. ALL SUCH MATERIALS SHALL BE FULLY |
| | REFLECTORIZED. |
| | MAINTENANCE OF SIGNS DURING CONSTRUCTION |
| | IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PLACE |
| | AND MAINTAIN ALL REQUIRED TEMPORARY SIGNING |
| | THROUGHOUT THE LIFE OF THE PROJECT. |
| | |
| | MANUEL JULIAN GONZALEZ |
| | ENGINEERING PROJECT COORDINATOR |
| | ENGINEERING SERVICES DEPARTMENT |
| | 401 CLEMATIS STREET, 4TH FLOOR |
| | WEST PALM BEACH, FL 33401 |
| | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) |
| | MAIN PHONE: (561) 822-1200 |
| | DIRECT: (561) 494-1085 |
| | FAX: (561) 494-1116 |
| | MOBILE: (561) 644-7301 |
| | EMAIL: [email protected] |
| | WWW.WPB.ORG/ENGINEERING |
| | |
| | |
| | |
| | |