| Date |
Text |
| 2012-11-30 14:03:16 | FAILED |
| | |
| | PLEASE RESPOND TO COMMENTS IN WRITING. |
| | |
| | 1) THE PARKING LOT REQUIRES A SEPARATE PERMIT. PLEASE |
| | CONSIDER USING THE D CURB INSTEAD OF THE WHEEL STOPS |
| | AND ALLOWING A TWO (2) FOOT OVERHANG TO PROVIDE SOME |
| | MORE GREEN AREA ON THE SITE. STAFF ACKNOWLEDGES THAT |
| | THE PLANS INCLUDE THE D CURB DETAIL, BUT THE SUGGESTION |
| | IS NOT TO HAVE A WHEEL STOP AND A D CURB, BUT RATHER |
| | MOVE THE D CURB IN FROM THE END OF THE PARKING SPACE |
| | AND INSTALL IT IN PLACE OF THE WHEEL STOP SO THAT SOD, |
| | NOT PAVING, IS OVERHUNG BY THE CAR. IF THE OWNER WISHES |
| | TO CONSTRUCT THE PARKING LOT WITH THE WHEEL STOP AND |
| | THE CURB AT EACH PARKING SPACE, THEN THE PLANS |
| | SUBMITTED AS PART OF THE PARKING LOT PERMIT WILL BE |
| | REVIEWED AS SUCH. |
| | |
| | 2) THE LANDSCAPE REQUIRES A SEPARATE LANDSCAPE PERMIT. |
| | |
| | 3) REPEAT COMMENT - THE SITE NO LONGER SHOWS A DUMPSTER |
| | ON-SITE. PLEASE PROVIDE WRITTEN VERIFICATION FROM THE |
| | SANITATION DEPARTMENT THAT NO DUMPSTER IS REQUIRED. |
| | |
| | 4) REPEAT COMMENT - PROVIDE VERIFICATION THAT THE |
| | LIGHTING WILL INCLUDE SHIELDING TO PREVENT GLARE INTO |
| | THE 25TH STREET RIGHT-OF-WAY. |
| | |
| | 5) REPEAT COMMENT - THE SITE PLAN DOES NOT SHOW THE |
| | PROVISION OF A/C EQUIPMENT, YET THE MECHANICAL AND |
| | ELECTRIC PLANS SHOW GROUND MOUNTED CONDENSING UNITS. |
| | ADDITIONALLY, THERE APPEARS TO BE A MINI SPLIT UNIT |
| | THAT IS LABELED AS CU-1 ON THE EAST SIDE OF THE |
| | BUILDING WHICH IS NOT SHOWN ON THE ELEVATIONS AND |
| | APPEARS TO IMPEDE THE ADA PARKING AISLE. THE NMUD |
| | REGULATIONS REQUIRE THAT MECHANICAL EQUIPMENT BE |
| | SCREENED FROM VIEW BY LANDSCAPING OR BUILT ELEMENTS |
| | DESIGN AS AN INTEGRAL PART OF THE BUILDING |
| | ARCHITECTURE. THIS NEEDS TO BE REFLECTED ON THE PLANS. |
| | |
| | 6) THE WIDOWS WERE INCLUDED ON AN EARLIER PERMIT THAT |
| | EXPIRED AND IS NOW BEING REACTIVATED BY THIS PERMIT, SO |
| | PLEASE INCLUDE SHEET A-3.1 WHICH VERIFIED THAT THE |
| | GLAZING REQUIREMENTS WERE MET. |
| | |
| | 7) PLEASE NOTE THAT COMMENTS NO. 1 AND 2., THE |
| | ADDITIONAL PERMITS, WILL BE INCLUDED AS A CONDITIONAL |
| | PERMIT IF THEY ARE NOT SUBMITTED PRIOR TO THE |
| | RESUBMITTAL TO ADDRESS THE OUTSTANDING COMMENTS LISTED |
| | ABOVE. THE CONDITIONAL PERMIT WOULD NEED TO BE |
| | SATISFIED PRIOR TO THE ISSUANCE OF A CERTIFICATE OF |
| | OCCUPANCY/CERTIFICATE OF COMPLETION ON THIS PERMIT. |
| | STAFF HOPES THAT THE REQUIRED PERMITS ARE SUBMITTED |
| | PRIOR TO THE RESUBMITTAL SO THAT NO CONDITIONAL PERMIT |
| | IS REQUIRED. |
| | |
| | CONTACT ERIC SCHNEIDER @ (561) 822-1446. |
| 2012-11-08 15:02:56 | 11/8 |