| 2012-02-10 10:07:21 | 2007 FBC W/2009 REVISIONS |
| | |
| | DENIED BY BUILDING |
| | |
| | 1) THE ENERGY CALCULATION FORM DOES NOT CORRESPOND WITH |
| | THE PLANS. THE ENERGY CALC. FORM LISTS R-20 CEILING |
| | INSULATION, R-13 WALL INSULATION, R-0 SLAB FLOOR |
| | INSULATION AND R-13 RAISED FLOOR INSULATION. THE TWO |
| | STORY WALL SECTION ON PLAN SHEET A-5 HAS R-30 CEILING |
| | INSULATION, R-11 WALL INSULATION AND NO INSULATION IN |
| | THE RAISED FLOOR. PLEASE CORRECT. |
| | |
| | 2) THE OWNER/AGENT IS REQUIRED TO SIGN THE ENERGY |
| | CALCULATION FORM. |
| | |
| | 3) THE NEW FOOTINGS ARE REQUIRED TO BE TREATED FOR |
| | TERMITES. SHOW COMPLIANCE WITH FBC R320. |
| | |
| | 4) ON THE FOUNDATION PLAN ON SHEET A-5, THE F1 FOOTER |
| | FOR THE NEW BEARING WALL IS INCORRECTLY SPECIFIED AS |
| | 36" X 36" X 12" W/#5 @ 8" OC. IT SHOULD BE 24" X 12" |
| | CONC. FOOTER W/3 #5 BARS. PLEASE CORRECT. |
| | |
| | 5) ON SHEET A-6 THE ROOF NOTES LOADING FOR THE NEW |
| | STRUCTURAL MEMBERS IS ILLEGIBLE. PLEASE CORRECT. CITY |
| | AMENDMENTS 106.1 |
| | |
| | 6) ON SHEET A-6 THE ADDED STRAP DETAIL IS FOR ATTACHING |
| | THE TRUSS TO A CONCRETE BEAM, HOWEVER, THIS STRUCTURE |
| | IS WOOD FRAME. PLEASE CORRECT. CITY AMENDMENTS 106.1 |
| | |
| | 7) PROVIDE COMPLETE DETAILS FOR THE NEW FIRE PLACE AND |
| | CHIMNEY SHOWN ON THE PLANS, INCLUDING STRUCTURAL |
| | DRAWINGS. CITY AMENDMENTS 106.1 & FBCR M1805 |
| | |
| | 8) SHOW COMPLIANCE WITH FBC R313.2.1 AND R313.4 FOR |
| | SMOKE ALARMS AND CARBON MONOXIDE PROTECTION. |
| | |
| | 9) SUBMIT TWO COMPLETE SETS OF PRODUCT APPROVALS FOR |
| | THE EXTERIOR FRENCH DOORS AS REQUIRED BY DCA RULE 9N-3. |
| | |
| | 10) THE PRODUCT APPROVALS THAT WERE SUBMITTED FOR THE |
| | SINGLE HUNG WINDOWS DO NOT MEET THE NEGATIVE COMPONENT |
| | AND CLADDING PRESSURE OF - 47.2 PSF SPECIFIED ON PLAN |
| | SHEET A-2. THE MAXIMUM DESIGN PRESSURE ON THE PRODUCT |
| | APPROVAL IS +45 / -45 PSF. FBC R301.2.1 ALSO THE |
| | INSTALLATION INSTRUCTIONS ARE INCOMPLETE. WHEN |
| | DOWNLOADING THEY HAVE TO BE SHRUNK TO FIT ON 8.5 X 11 |
| | PAPER. |
| | |
| | 11) SHOW COMPLIANCE WITH FBCR 301.2.1.2 FOR IMPACT |
| | PROTECTION OF GLAZED OPENINGS. SUBMIT (2) TWO COPIES OF |
| | A PRODUCT APPROVAL FOR STORM PANELS, A KEY PLAN AND AN |
| | INSTALLATION SCHEDULE. |
| | |
| | 12) PLEASE PROVIDE A RESPONSE LETTER INDICATING HOW |
| | EACH OF THE REVIEW COMMENTS HAS BEEN ADDRESSED. |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)805-6714 |
| | [email protected] |