| 2012-01-17 16:56:05 | 2007 FBC W/2009 REVISIONS |
| | |
| | DENIED BY BUILDING |
| | |
| | 1) THE STRUCTURE IS LOCATED LESS THAN 700 FEET FROM THE |
| | INTER-COASTAL WATERWAY WHICH MAKES THE EXPOSURE |
| | CATEGORY C. SEE FBC R301.2.1.4.3. |
| | |
| | 2) REVISE THE COMPONENT AND CLADDING PRESSURES ON SHEET |
| | ONE TO COMPLY WITH EXPOSURE CATEGORY C. SEE FBC |
| | R301.2.1. |
| | |
| | 3) PLEASE HAVE THE STRUCTURAL ENGINEER REVIEW THE SOIL |
| | REPORT FROM D & N DRILLING AND ENGINEERING, INC. TO |
| | INSURE THAT THE FOOTING DESIGN IS ADEQUATE. THE SOIL |
| | ENGINEER RECOMMENDS 24" WIDE CONTINUOUS FOOTERS AND A |
| | MINIMUM OF 36" FOR INDIVIDUAL FOOTERS WITH A MINIMUM |
| | DEPTH OF 18" BELOW THE LOWEST BORDERING FINISHED GRADE. |
| | |
| | 4) ON SHEET 4 THE DOOR BUCKS ARE SPECIFIED AS 2 X 4 |
| | WHICH MAY NOT BE WIDE ENOUGH TO PROVIDE FULL SUPPORT OF |
| | THE DOOR FRAME AS REQUIRED BY FBC R613.6.1.1. PLEASE |
| | REVISE. |
| | |
| | 5) FBC R308.4 REQUIRES GLAZING IN BATHROOM WINDOWS AND |
| | DOORS WHERE THE BOTTOM EDGE IS OF THE GLAZING IS LESS |
| | THAN 60 INCHES ABOVE ANY STANDING OR WALKING SURFACE TO |
| | BE SAFETY GLASS OR IMPACT RATED GLASS. |
| | |
| | 6) SPECIFY THE TRUSS UPLIFT PRESSURES AND PROVIDE A |
| | TRUSS ANCHOR SCHEDULE ON THE PLANS. SEE FBC R802.1.6.5. |
| | |
| | 7) SUBMIT TWO COMPLETE COPIES OF PRODUCT APPROVALS FOR |
| | THE NEW EXTERIOR DOORS, WINDOWS, STRUCTURAL MULLIONS |
| | AND ROOFING COVERING MATERIALS AS REQUIRED BY DCA 9N-3. |
| | IN ADDITION TO THE FLORIDA PRODUCT APPROVAL COVER |
| | SHEETS THAT WERE SUBMITTED, THE PRODUCT EVALUATIONS AND |
| | INSTALLATION INSTRUCTIONS ARE REQUIRED. THESE ARE |
| | AVAILABLE ON LINE AT |
| | WWW.FLORIDABUILDING.ORG/C/DEFAULT.ASPX . |
| | |
| | 8) TWO SETS OF THE PRODUCT APPROVALS ARE REQUIRED FOR |
| | EACH DIFFERENT TYPE OF WINDOW OR DOOR. CITY AMENDMENTS |
| | 106.1. |
| | |
| | 9) IF HURRICANE PANELS ARE BEING USED, SUBMIT TWO SETS |
| | OF PRODUCT APPROVALS, KEY PLANS AND INSTALLATION |
| | SCHEDULES FOR THEM. DCA RULE 9N-3 AND FBC R301.2.1.2 |
| | FOR INSTALLATION SCHEDULES SEE WWW.WPB.ORG/CONSTRUCTION |
| | /PDF/SCHEDULE_FOR_INSTALLATION.PDF. |
| | |
| | 10) SPECIFY WHICH ONE OF THE ROOF TILE ATTACHMENT |
| | METHODS LISTED IN THE PRODUCT APPROVAL WILL BE USED. IF |
| | USING A MORTAR OR ADHESIVE SET SYSTEM SUBMIT PRODUCT |
| | APPROVALS FOR THE PRODUCT THAT WILL BE USED. DCA RULE |
| | 9N-3. |
| | |
| | 11) PROVIDE A DETAIL FOR THE SISTERED 2 X 4 TRUSS TAILS |
| | SHOWN ON THE WALL SECTIONS ON SHEET 7. FBC R801.2 |
| | |
| | 12) THE PLANS SPECIFY A NEW 4 X 4 STEEL COLUMN AT THE |
| | COVERED PATIO. PROVIDE A DETAIL FOR THE 4 X 4 STEEL |
| | COLUMN BASE AND CAP. |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)805-6714 |
| | [email protected] |