| Date |
Text |
| 2012-01-24 15:44:05 | RESIDENTIAL (R3) ALTERATION, BUILDING REVIEW COMMENTS. |
| | 2007 FLORIDA RESIDENTIAL CODE WITH 2009 REVISIONS. |
| | |
| | 1- NEED TO PROVIDE A 36" MINIMUM LANDING AT DOOR AS |
| | REQUIRED BY SEC. R311.4.3 OF THE 2007 FLORIDA |
| | RESIDENTIAL CODE. REVISE DRAWINGS AS REQUIRED. AND, |
| | CLEARLY SHOW NUMBER OF RISERS REQUIRED. DRAWING |
| | SUBMITTED SHOWS 21" HEIGHT FROM THE DOOR SILL TO THE |
| | FINISH GROUND, BUT ONLY TWO RISERS WERE SHOWN. |
| | |
| | 2- PROVIDE COMPLETE STRUCTURAL FRAMING DETAIL FOR NEW |
| | DOOR. KEEP IN CONSIDERATION THAT EXISTING HOUSE |
| | CONSTRUCTION IS HOLLOW TILE. THE DOOR ANCHORING |
| | REQUIREMENTS NEED TO COMPLY WITH SEC. R613.6. |
| | STRUCTURAL FRAMING NEED TO COMPLY WITH THE DESIGN |
| | PRESSURES REQUIRED BY SEC. R301.2.1.4.3. |
| | |
| | 3- PROVIDE PRODUCT APPROVAL (2 COPIES) AS REQUIRED BY |
| | DCA RULE 9N-3 FOR THE NEW DOOR TO BE INSTALLED. DOOR |
| | NEEDS TO MEET THE DESIGN PRESSURES OF SEC. |
| | R301.2.1.4.3. NO PRODUCT APPROVAL WAS SUBMITTED. ONLY |
| | STORM SHUTTERS PRODUCT APPROVAL WAS SUBMITTED. |
| | |
| | 4- PROVIDE COMPLETE INSTALLATION SCHEDULE FOR THE |
| | INSTALLATION OF STORM PANELS. |
| | ***NOTE: HOUSE CONSTRUCTION IS HOLLOW TILE. VERIFY THAT |
| | STORM PANEL PRODUCT APRPOVAL INCLUDES THE INSTALLATION |
| | OF STORM SHUTTERS TO HOLLOW CLAY. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CALL |
| | JULIO GOMEZ |
| | (561)805-6712 |