| Plan Review Notes For Permit 11110659 |
| Permit Number |
11110659 |
|
| Review Stop |
P |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2011-12-14 15:24:45 | FBC 2007 PLUMBING: | | | | | | 1. PAGE 6 - VENTS WILL BE REQUIRED FOR THE SANITARY | | | ISOMETRIC DRAWING. THE RUNOUTS ARE CONSIDERED A | | | COMBINATION DRAIN AND VENT SYSTEM. | | | 912.2.2 CONNECTION. THE COMBINATION DRAIN AND VENT | | | SYSTEM SHALL BE PROVIDED WITH A DRY VENT CONNECTED AT | | | ANY POINT WITHIN THE SYSTEM OR THE SYSTEM SHALL CONNECT | | | TO A HORIZONTAL DRAIN THAT IS VENTED IN ACCORDANCE WITH | | | ONE OF THE VENTING METHODS SPECIFIED IN THIS CHAPTER. | | | | | | REVIEW BY | | | LARRY WAGNER | | | CHIEF PLUMBING INSPECTOR | | | PHONE # 805-6692 | | | EMAIL [email protected] | | | FAX # 805-6676 | | | | | | | | | | | | | | | | | | | | | |
|