| Plan Review Notes For Permit 11100255 |
| Permit Number |
11100255 |
|
| Review Stop |
P |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2011-10-14 14:11:57 | ****PROVISO**** | | | | | | 712.2 VALVES REQUIRED. A CHECK VALVE AND A FULL OPEN | | | VALVE LOCATED ON THE DISCHARGE SIDE OF THE CHECK VALVE | | | SHALL BE INSTALLED IN THE PUMP OR EJECTOR DISCHARGE | | | PIPING BETWEEN THE PUMP OR EJECTOR AND THE GRAVITY | | | DRAINAGE SYSTEM. | | | | | | 712.3.5 EJECTOR CONNECTION TO THE DRAINAGE SYSTEM?WHERE | | | THE DISCHARGE LINE CONNECTS INTO HORIZONTAL DRAINAGE | | | PIPING, THE CONNECTOR SHALL BE MADE THROUGH A WYE | | | FITTING INTO THE TOP OF THE DRAINAGE PIPING. | | | |
|