| Date |
Text |
| 2011-11-01 11:20:33 | FBC 2007 PLUMBING REVIEW #1 |
| | |
| | PLEASE SEE NOTES FROM BUILDING REVIEW BELOW: |
| | PLEASE REVIEW 11-4.1.6(2) ALTERATIONS TO AN AREA |
| | CONTAINING A PRIMARY FUNCTION. IN ADDITION TO THE |
| | REQUIREMENTS OF SECTION 11-4.1.6(1), AN ALTERATION THAT |
| | AFFECTS OR COULD AFFECT THE USABILITY OF OR ACCESS TO |
| | AN AREA CONTAINING A PRIMARY FUNCTION SHALL BE MADE SO |
| | AS TO ENSURE THAT, TO THE MAXIMUM EXTENT FEASIBLE, THE |
| | PATH OF TRAVEL TO THE ALTERED AREA AND THE RESTROOMS, |
| | TELEPHONES, AND DRINKING FOUNTAINS SERVING THE ALTERED |
| | AREA, ARE READILY ACCESSIBLE TO AND USABLE BY |
| | INDIVIDUALS WITH DISABILITIES, UNLESS SUCH ALTERATIONS |
| | ARE DISPROPORTIONATE TO THE OVERALL ALTERATIONS TIN |
| | TERMS OF COST AND SCOPE. |
| | ALTERATIONS MADE TO PROVIDE AN ACCESSIBLE PATH OF |
| | TRAVEL TO ALTERED AREAS SHALL BE DEEMED |
| | DISPROPORTIONATE TO THE OVERALL ALTERATION WHEN THE |
| | COST EXCEEDS 20 PERCENT OF THE COST OF THE ALTERATION |
| | TO THE PRIMARY FUNCTION AREA. |
| | |
| | DUTY TO PROVIDE ACCESSIBLE FEATURES IN THE EVENT OF |
| | DISPROPORTIONALITY. |
| | |
| | (1) WHEN THE COST OF ALTERATIONS NECESSARY TO MAKE THE |
| | PATH OF TRAVEL TO THE ALTERED AREA FULLY ACCESSIBLE IS |
| | DISPROPORTIONATE TO THE COST OF THE OVERALL ALTERATION, |
| | THE PATH OF TRAVEL SHALL BE MADE ACCESSIBLE TO THE |
| | EXTENT THAT IT CAN BE MADE ACCESSIBLE WITHOUT INCURRING |
| | DISPROPORTIONATE COSTS. |
| | |
| | (2)(A) IN CHOOSING WHICH ACCESSIBLE ELEMENTS TO |
| | PROVIDE, PRIORITY SHOULD BE GIVEN TO THOSE ELEMENTS |
| | THAT WILL PROVIDE THE GREATEST ACCESS, IN THE FOLLOWING |
| | ORDER: |
| | |
| | (I) AN ACCESSIBLE ENTRANCE; |
| | |
| | (II) AN ACCESSIBLE ROUTE TO THE ALTERED AREA: |
| | |
| | (III) AT LEAST ONE ACCESSIBLE RESTROOM FOR EACH SEX OR |
| | A SINGLE UNISEX RESTROOM: |
| | |
| | (IV) ACCESSIBLE TELEPHONES; |
| | |
| | (V) ACCESSIBLE DRINKING FOUNTAINS; AND |
| | |
| | (VI) WHEN POSSIBLE, ADDITIONAL ACCESSIBLE ELEMENTS SUCH |
| | AS PARKING, STORAGE, AND ALARMS. |
| | |
| | REVIEW BY |
| | LARRY WAGNER |
| | CHIEF PLUMBING INSPECTOR |
| | PHONE # 805-6692 |
| | EMAIL [email protected] |
| | FAX # 805-6676 |
| | |
| | |
| | |