| Plan Review Notes For Permit 11090506 |
| Permit Number |
11090506 |
|
| Review Stop |
B |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2011-11-02 13:14:29 | ROOFING RE-SUBMITTAL CHECKLIST. | | | 2007 FBC WITH 2009 REVISIONS. | | | | | | 1- ENGINEER DOING THE RAS 117 CALCULATIONS NEEDS TO | | | REVISE THE FLAT ROOF BASE FASTENING SPACING FOR ZONE #2 | | | (PERIMETER AREA). ACCORDING TO SEC. 10.4.5 OF RAS 117, | | | ALL FRACTIONS SHALL BE ROUNDED DOWN TO THE NEXT WHOLE | | | NUMBER. ENGINEER SPECIFIES FASTENER SPACING AT 7.5". | | | REVISE AS REQUIRED. NEED TO ROUND DOWN TO THE NEXT | | | WHOLE NUMBER. | | | | | | 2- ALL PRODUCT APPROVALS (METAL ROOFING AND FLAT ROOF | | | ASSEMBLY) NEED TO BE REVIEWED AND APPROVED IN WRITING | | | (NOT SIGNING AND SEALING) BY THE ENGINEER OF RECORD AS | | | REQUIRED BY SEC. 106.3.3 CITY AMENDMENTS TO FBC. SUBMIT | | | ALL PRODUCT APPROVALS WITH THE ENGINEER'S OF RECORD | | | APPROVAL. | | | | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561)805-6712 |
|