| 2012-03-27 14:01:52 | 2007 FBC W/2009 REVISIONS |
| | |
| | DENIED BY BUILDING |
| | |
| | 1) SUBMIT TWO SETS OF PRODUCT APPROVALS OR SITE |
| | SPECIFIC ENGINEERING FOR THE TWO 8' X 8' CUSTOM |
| | OUTSWING DOORS AS REQUIRED BY DCA RULE 9N-3. THE CUSTOM |
| | DOORS ARE REQUIRED TO MEET COMPONENT AND CLADDING |
| | WINDLOAD PRESSURES PER FBC R301.2.1. |
| | |
| | 2) SUBMIT TWO SETS OF PRODUCT APPROVALS FOR THE |
| | FUNCTIONAL STORM SHUTTERS SPECIFIED ON SHEET A-3.0 AS |
| | REQUIRED BY DCA RULE 9N-3 AND FBC R301.2.1. |
| | |
| | 3) SUBMIT TWO SETS OF INSTALLATION SCHEDULES FOR THE |
| | GARAGE DOOR STORM PANELS AND THE FUNCTIONAL STORM |
| | SHUTTERS IN ORDER TO VERIFY WINDLOAD REQUIREMENTS OF |
| | FBC R301.2.1. |
| | |
| | 4) THE VALUE OF THE PROJECT SPECIFIED ON THE PERMIT |
| | APPLICATION IS LOW. FOR PERMITTING PURPOSES THE VALUE |
| | IS BASED ON THE CURRENT CONSTRUCTION COSTS AS IF THE |
| | WORK WAS BEING DONE BY A LICENSED CONTRACTOR AND |
| | INCLUDES ALL RELATED COSTS INCLUDING DESIGN FEES, |
| | LABOR, MATERIAL, OVERHEAD AND PROFIT PER CITY |
| | AMENDMENTS 108.3. THE CALCULATED COST OF THE NEW |
| | DETACHED GARAGE AND THE AREA ADDED TO THE EXISTING TWO |
| | STORY DWELLING IS $ 80, 412.04. THIS DOES NOT INCLUDE |
| | THE COST OF REMODELING THE EXISTING PART OF THE TWO |
| | STORY DWELLING. PLEASE PROVIDE AN APPROPRIATE VALUE |
| | BASED ON THE INFORMATION PROVIDED. |
| | |
| | 5) PLEASE SUBMIT A RESPONSE LETTER INDICATING HOW THE |
| | REVIEW COMMENTS WILL BE ADDRESSED. |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)805-6714 |
| | [email protected] |