| Plan Review Notes For Permit 11090393 |
| Permit Number |
11090393 |
|
| Review Stop |
P |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2011-09-21 11:31:53 | *****PROVISO***** | | | | | | 712.2 VALVES REQUIRED. A CHECK VALVE AND A FULL OPEN | | | VALVE LOCATED ON THE DISCHARGE SIDE OF THE CHECK VALVE | | | SHALL BE INSTALLED IN THE PUMP OR EJECTOR DISCHARGE | | | PIPING BETWEEN THE PUMP OR EJECTOR | | | | | | 712.3.5 EJECTOR CONNECTION TO THE DRAINAGE SYSTEM. | | | PUMPS CONNECTED TO THE DRAINAGE SYSTEM SHALL CONNECT TO | | | THE BUILDING SEWER OR SHALL CONNECT TO A WYE FITTING IN | | | THE BUILDING DRAIN A MINIMUM OF 10 FEET (3048 MM) FROM | | | THE BASE OF ANY SOIL STACK, WASTE STACK OR FIXTURE | | | DRAIN. WHERE THE DISCHARGE LINE CONNECTS INTO | | | HORIZONTAL DRAINAGE PIPING, THE CONNECTOR SHALL BE MADE | | | THROUGH A WYE FITTING INTO THE TOP OF THE DRAINAGE | | | PIPING. | | | |
|