| 2011-08-10 11:20:43 | 2007 FBC W/2009 REVISIONS |
| | |
| | DENIED BY BUILDING |
| | |
| | 1) THE FLOOD ZONE DESIGNATION LISTED ON THE SURVEY AND |
| | SHEET 101 OF THE PLANS IS INCORRECT. THE CORRECT FLOOD |
| | ZONE IS B. PLEASE CORRECT. |
| | |
| | 2) THE PLANS SPECIFY EXPOSURE CATEGORY B ON SHEETS 306 |
| | AND 401, HOWEVER, THE STRUCTURE IS LOCATED WITHIN 600 |
| | FEET OF THE INTER-COASTAL WATERWAY. THEREFORE, IT IS |
| | CONSIDERED EXPOSURE C AND THE ROOF SHEATHING AND ROOF |
| | TO WALL UPLIFT LOADS ARE REQUIRED TO BE INCREASED BY 20 |
| | PERCENT PER FBC R301.2.1.4.3. PLEASE CORRECT. |
| | |
| | 3) PLEASE REVISE THE COMPONENT AND CLADDING PRESSURES |
| | IN THE EXTERIOR OPENING SCHEDULE TO EXPOSURE C. FBC |
| | R301.2.1 |
| | |
| | 4) FBC R 803.2.3.1 REQUIRES THE ROOF SHEATHING TO BE |
| | FASTENED WITH 8D RING SHANK NAILS. |
| | |
| | 5) ROOF ZONE 3 IS NOT LISTED IN THE NAILING SCHEDULE ON |
| | SHEET 306. SEE FBCR FIGURE R301.2(7). PLEASE CORRECT. |
| | |
| | 6) SPECIFY THE WINDOW AND DOOR BUCK TO SUBSTRATE |
| | ATTACHMENTS ON THE PLANS. FBC R613.6.1 |
| | |
| | 7) SPECIFY THE METHOD OF ATTACHMENT FROM THE PRODUCT |
| | APPROVAL THAT WILL BE USED TO INSTALL THE ROOF TILE AND |
| | RESIST THE OVERTURN MOMENT. FBC R905.3.7 |
| | |
| | 8) THE PRODUCT APPROVALS ARE REQUIRED TO BE REVIEWED |
| | AND APPROVED IN WRITING BY THE DESIGNER OF RECORD. CITY |
| | AMENDMENTS 106.3.3 |
| | |
| | 9) THE PRODUCT APPROVAL NOAS FOR THE PGT FIXED GLASS PW |
| | 701 AND THE ENTEGRA PLANTATION ROOF TILE HAVE BEEN |
| | SUPERSEDED. PLEASE SUBMIT THE CURRENT NOAS. (PW701 IS |
| | NOA 10-0504.05 AND ENTEGRA PLANTATION ROOF TILE IS |
| | 10-1202.01) |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)805-6714 |
| | [email protected] |