| Plan Review Notes For Permit 11060472 |
| Permit Number |
11060472 |
|
| Review Stop |
L |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2011-06-21 10:52:29 | ***LANDSCAPE REVIEW FAILED*** | | | | | | PLEASE RESPOND TO REVIEW COMMENTS IN WRITTEN FORMAT. | | | | | | 1. PLEASE SUBMIT TWO SETS OF LANDSCAPE PLANS AND A | | | CERTIFIED COST ESTIMATE THAT INCLUDES THE TOTAL COST OF | | | ALL LANDSCAPE MATERIALS AND LABOR, BROKEN DOWN INTO | | | UNIT COST. | | | | | | 2. PLEASE PROVIDE THE TABULATION NECESSARY FOR THE | | | EVALUATION OF COMPLIANCE WITH ARTICLE XIV OF THE ZONING | | | AND LAND DEVELOPMENT REGULATIONS, INCLUDING THE | | | XERISCAPE DESIGN OPTIONS. | | | | | | 3. PURSUANT TO SECTION 94-445 (4) (G) (3) (II), THE | | | IRRIGATION SYSTEM SHALL BE DESIGNED TO HAVE 120 PERCENT | | | COVERAGE TO ALL LANDSCAPED AREAS, INCLUDING THE | | | RIGHT-OF-WAY. PLEASE APPLY FOR A SEPARATE IRRIGATION | | | PERMIT AND SUBMIT TWO SETS OF IRRIGATION PLANS. | | | | | | 4. PURSUANT TO SECTION 94-448 (D) (2), THE LANDSCAPE | | | PLAN SHALL INCLUDE ALL OF THE ITEMS ENUMERATED IN THIS | | | SECTION. THE SPACING OF ALL PROPOSED PLANT MATERIAL | | | SHALL BE INCLUDED ON THE PLANT LIST. | | | | | | 5. STAFF RECOMMENDS THAT FOUNDATION LANDSCAPING BE | | | INSTALLED ALONG THE FRONT BUILDING ELEVATION AND THAT | | | THE PROPOSED HEDGE BE PLANTED ALONG THE NORTH EDGE OF | | | THE DRIVEWAY, INSTEAD OF ALONG THE CITY SIDEWALK. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT ROBERT | | | KUSSNER @ (561) 822-1462 | | | |
|