| 2011-06-20 09:04:42 | 2007 FBC W/2009 REVISIONS | | | DENIED BY MECHANICAL | | | | | | 1) THE RETURN AIR TRANSFER DUCT FROM THE MASTER SUITE | | | IS REQUIRED TO BE ONE AND ONE HALF TIMES THE CROSS | | | SECTIONAL AREA OF THE SUPPLY DUCT ENTERING THE ROOM. | | | THE PLANS SPECIFY A 10" SUPPLY FOR THE MASTER SUITE | | | WHICH WILL REQUIRE 14" DIAMETER TRANSFER DUCT. | | | | | | 2) THE EQUIPMENT SIZING CALCULATIONS SPECIFIES A LATENT | | | COOLING EQUIPMENT TOTAL LOAD OF 29272 BTUH ( 2.5 TON) | | | AND A TOTAL CAPACITY OF 3.0 TON. THE EXISTING UNIT IS | | | 2.5 TON. PLEASE CORRECT THE FORM. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|