Plan Review Notes
Plan Review Notes For Permit 11050710
Permit Number 11050710
Review Stop FIRE
Sequence Number 1
Notes
Date Text
2011-05-27 16:11:521 NORTH CLEMATIS STREET, SUITE #110
 PERMIT #11050710
 REVIEW COMMENTS - FIRE DEPARTMENT
  
 ALL DEMOLITION WORK SHALL CONFORM TO THE REQUIREMENTS
 OF NFPA 241.
  
 FIRE PROTECTION SYSTEMS SHALL REMAIN ACTIVE DURING
 DEMOLITION AND RENOVATION ACTIVITIES. IN THE EVENT A
 FIRE PROTECTION SYSTEM IS OUT OF SERVICE FOR MORE THAN
 4-HOURS IN A 24-HOUR PERIOD, THE BUILDING SHALL BE
 PLACED UNDER A FIRE WATCH. ALL FIRE WATCH REQUESTS MUST
 BE APPROVED AND SUBMITTED IN WRITING TO THE OFFICE OF
 THE FIRE MARSHAL.
  
 PROVIDE AN EXTERIOR KEY SAFE TO ALLOW EMERGENCY
 RESPONDERS NON-FORCIBLE ENTRY INTO THE BUILDING DURING
 NON-BUSINESS HOURS. A KEY SAFE CAN BE ORDERED FROM
 WWW.KNOXBOX.COM.
  
 PROVIDE PORTABLE FIRE EXTINGUISHER LOCATIONS ON PLANS.
 EXTINGUISHERS SHALL HAVE A MINIMUM RATING OF 2A:10BC
 AND SHALL BE TAGGED BY A LICENSED FIRE EXTINGUISHER
 COMPANY. TRAVEL DISTANCE TO EXTINGUISHERS SHALL NOT
 EXCEED 75 FEET.
  
 PROVIDE TACTILE SIGNAGE AT EXIT DOORS.
  
 IF ENTRY DOOR 102 IS EQUIPPED WITH A LATCH, PANIC
 HARDWARE IS NEEDED ON THIS EXISTING DOOR.
  
 THE OCCUPANT LOAD TO BE POSTED IN THE BUILDING INTERIOR
 SHOULD NOT INCLUDE THE EXTERIOR SEATING.
  
 INDICATE THE AMOUNT OF COAL THAT CAN BE STORED IN THE
 COAL STORAGE COMPARTMENT OF THE BRICK OVEN. NOTE: PER
 NFPA 96 SECTION 14.9.2.1. FUEL STORAGE SHALL NOT EXCEED
 A ONE-DAY SUPPLY WHERE STORAGE IS LOCATED IN THE SAME
 ROOM AS THE SOLID FUELED APPLIANCE, OR IN THE SAME
 ROOMS AS THE FUEL-LOADING OR CLEAN-OUT DOORS.
  
 PER NFPA 96 SECTION14.9.3.7.3 APPLIANCES WITH FIREBOXES
 OVER 5 FT3 THE WATER SOURCE SHALL BE A FIXED PIPE WATER
 SYSTEM WITH A HOSE OF ADEQUATE LENGTH TO REACH THE
 COMBUSTION AND COOKING CHAMBERS OF THE APPLIANCE.
  
 ALL OVEN ASH SHALL BE REMOVED FROM THE ASH COMPARTMENT
 AT LEAST ONCE PER DAY. THE ASH SHALL BE SPRAYED
 ADEQUATELY WITH WATER BEFORE REMOVAL TO EXTINGUISH ANY
 HOT ASH OR CINDERS AND TO CONTROL THE DUST WHEN THE ASH
 IS MOVED.
  
 PER NFPA 96 SECTION 14.9.3.8.1 A HEAVY METAL CONTAINER
 OR CART (MINIMUM 16 GAUGE) WITH A COVER SHALL BE
 PROVIDED FOR THE REMOVAL OF ASH. THE ASH REMOVAL
 CONTAINER OR CART SHALL NOT EXCEED A MAXIMUM OF 20 GAL
 CAPACITY, SHALL BE ASSIGNED FOR THIS ONE PURPOSE, SHALL
 BE ABLE TO BE HANDLED EASILY BY ANY EMPLOYEE ASSIGNED
 THE TASK, AND SHALL PASS EASILY THROUGH ANY PASSAGEWAY
 TO THE OUTSIDE OF THE BUILDING. THE CONTAINER OR CART
 SHALL ALWAYS BE COVERED WHEN IT IS BEING MOVED THROUGH
 THE PREMISES.
  
 FOR ISSUANCE OF A GENERAL BUILDING PERMIT, SEALED
 CONSTRUCTION DOCUMENTS ARE REQUIRED FOR FIRE SPRINKLER
 AND FIRE ALARM INSTALLATION AND MODIFICATIONS. UNDER A
 SEPARATE PERMIT, SHOP DRAWINGS CONFORMING TO THE
 ENGINEER'S CONSTRUCTION DOCUMENTS WILL BE REQUIRED
 AFTER THE GENERAL BUILDING PERMIT HAS BEEN ISSUED.
  
 PROVIDE A DETAIL OF THE LARGE AMERITIC LIGHTING
 FIXTURES (P11). NOTE: THESE LIGHTING FIXTURES MAY
 OBSTRUCT THE AUTOMATIC SPRINKLERS.
  
 WESLEY JOLIN
 WEST PALM BEACH FIRE RESCUE
 FIRE & LIFE SAFETY PLAN REVIEW