2011-05-11 16:17:52COMMERCIAL BUILDING RE-ROOF BUILDING REVIEW CHECKLIST.
 2007 FBC WITH 2009 REVISIONS.
  
 1- PROVIDE FIELD WITHDRAWAL RESISTANCE TEST (TAS 105)
 RESULTS AS REQUIRED BY SYSTEM LIMITATION #1 ON LAST
 PAGE OF NOA 08-0410.01 SUBMITTED. TESTS RESULTS ARE
 REQUIRED TO DO THE RAS 117 CALCULATIONS.
  
 2- ENGINEER TO REVISE THE RAS 117 CALCULATIONS
 SUBMITTED USING THE WITHDRAWAL RESISTANCE TEST RESULTS.
 SEE TAS 105.
  
 3- CONTRACTOR HIGHLIGHTED BASE SHEET FASTENING OPTION
 #2 ON PAGE 7 OF THE NOA 08-0410.01 SUBMITTED. ENGINEER
 RAS 117 CALCULATIONS SUBMITTED ARE DONE CONSIDERING
 BASE SHEET FASTENING OPTION #4. REVISE AS REQUIRED TO
 MATCH.
  
 4- CLARIFY WHY SUBMITTING NOA FOR SKYLIGHTS. PERMIT
 APPLICATION DOESN'T DESCRIBE SKYLIGHTS INSTALLATION. IF
 SO, CLARIFY IF REPLACING EXISTING SKYLIGHTS AND HOW
 MANY? REVISE PERMIT VALUATION ACCORDINGLY. SEC. 108.3
 CITY AMENDMENTS TO FBC.
  
 5- PERMIT VALUATION DECLARED IN THE PERMIT APPLICATION
 IS TOO LOW. VALUATION WAS UPDATED TO $45000. SEC. 108.3
 CITY AMENDMENTS TO FBC. PERMIT FEE BALANCE DUE IS
 $1230.20.
  
 6- CONTRACTOR SHOWN ON THE NOTICE OF COMMENCEMENT
 DOESN'T MATCH CONTRACTOR SHOWN ON THE PERMIT
 APPLICATION. REVISE AS REQUIRED TO MATCH.
  
 7- FOR YOUR INFORMATION: ANY ROOF EQUIPMENT REMOVAL
 REQUIRES SEPARATE BUILDING PERMITS.
  
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561)805-6712