Plan Review Notes
Plan Review Notes For Permit 11040556
Permit Number 11040556
Review Stop ENG
Sequence Number 1
Notes
Date Text
2011-05-10 09:23:04TREES (BLACK OLIVE SHADY LADY) PROPOSED ON THE EAST
 PROPERTY LINE IN THE UTILITY EASEMENT MAY NOT BE
 INSTALLED. OTHER PLANT MATERIAL SUCH AS THE PROPOSED
 SIMPSON'S STOPPERS MAY BE INSTALLED.
  
 PASSED WITH PROVISO:
 MUNICIPAL CODE SEC. 94-445. - PLANT MATERIAL STANDARDS
 AND SPECIFICATIONS.
 ALL PLANT AND NON-PLANT MATERIAL SHALL MEET OR EXCEED
 THE STANDARDS AND SPECIFICATIONS OF THIS SECTION.
 (4) REQUIRED PLANT MATERIAL SPECIFICATIONS
 F. ROOT SYSTEMS. PLANT MATERIALS SHALL BE SELECTED TO
 MINIMIZE POTENTIAL ROOT SYSTEM DAMAGE OR INTERFERENCE
 WITH PUBLIC UTILITIES. FRUIT AND DEBRIS, OTHER THAN
 LEAVES FROM INSTALLED PLANT MATERIALS, SHALL NOT
 CONSTITUTE A NUISANCE WITHIN PUBLIC RIGHTS-OF-WAY OR TO
 ABUTTING PROPERTY OWNERS.
 *******************************************************
 ****************
 ROOT BARRIER ZONE:
 1. ALL UTILITY WITHIN THE 20' ROOT BARRIER ZONE SHALL
 BE PROTECTED FROM TREE ROOTS BY THE PLACEMENT OF A ROOT
 BARRIER. (BARRIERS SHALL NOT BE USED TO "BOX-IN" TREE
 ROOTS.)
 2. ROOT BARRIER SHALL BE INSTALLED PER MANUFACTURER'S
 SPECIFICATIONS FOR A MINIMUM DISTANCE OF 20 LINEAR
 FEET. SEE DETAIL ATTACHED.
 INSPECTIONS: INSPECTIONS ARE REQUIRED AT EACH OF THE
 STEPS LISTED BELOW FOR WORK WITHIN OR IN PROXIMITY TO
 CITY UTILITY EASEMENT.
  
 CONTRACTOR SHALL CONTACT THE ENGINEERING SERVICES
 DEPARTMENT AT LEAST 48 HOURS (2 WORKING DAYS) IN
 ADVANCE OF AN ANTICIPATED INSPECTION. CONTACT
 ENGINEERING CONSTRUCTION COORDINATOR, JOSHUA MCDERMOTT
 (561) 644-7441 OR (561) 494-1040.
  
 A. ROUGH GRADE PRIOR TO COMMENCEMENT OF SOIL
 PREPARATION: UPON COMPLETION OF ROUGH GRADING AND PRIOR
 TO COMMENCEMENT OF SOIL PREPARATION, FOR ACCEPTANCE OF
 ROUGH GRADING WORK.
  
 B. FINISH GRADE: INSPECTION OF COMPLETED FINISH GRADING
 WORK FOLLOWING SOIL PREPARATION WORK.
  
 C. PLANT MATERIAL: INSPECTION OF PLANT MATERIALS UPON
 DELIVERY TO THE JOB SITE, BUT PRIOR TO PLANTING.
  
 D. PLANT LOCATIONS: WHEN CONTAINER PLANTS AND/OR BARE
 ROOTSTOCK ARE SPOTTED FOR PLANTING, BUT AFTER PLANTING
 HOLES ARE EXCAVATED. (SECURE EXCAVATED AREA AS REQUIRED
 TO MAKE SAFE DURING THIS PROCESS.)
  
 E. COMPLETED PLANTING: WHEN PLANTING AND ALL OTHER
 INDICATED OR SPECIFIED WORK HAS BEEN COMPLETED.
  
 F. CONTRACTOR SHALL COMPLY WITH NPDES AND IT?S
 POLLUTION PREVENTION RESPONSIBILITY. UPON COMPLETION OF
 THE WORK, CONTRACTOR SHALL SMOOTH ALL GROUND SURFACES;
 REMOVE EXCESS MATERIALS, RUBBISH, DEBRIS, ETC.; SWEEP
 ADJACENT STREETS, CURBS, GUTTERS; WASH DOWN ALL
 WALKWAYS, AND TRAILS; AND REMOVE CONSTRUCTION
 EQUIPMENT.
  
 CALL 811 - 48 HOURS BEFORE YOU DIG.
  
 BRIAN R. MOREE
 ENGINEERING CONSTRUCTION MANAGER
 401 CLEMATIS STREET
 WEST PALM BEAC, FLORIDA 33401
 561-494-1098
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved