Plan Review Notes
Plan Review Notes For Permit 11020699
Permit Number 11020699
Review Stop ENG
Sequence Number 1
Notes
Date Text
2011-04-07 07:24:54PASSED WITH PROVISOS:
  
 #1 PROJECT WILL BE SUBJECT TO INSPECTION ENFORCING THE
 NPDES (NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM)
 REQUIREMENTS.
  
 #2 CITY OF WPB WILL ENFORCE THE CLEAN WATER ACT, ALSO
 REFERRED TO AS "THE ACT" (FORMERLY REFERRED TO AS THE
 FEDERAL WATER POLLUTION CONTROL ACT OR FEDERAL WATER
 POLLUTION CONTROL ACT AMENDMENTS OF 1972) PUB.L.
 92-500, AS AMENDED PUB. L. 95-217, PUB. L. 95-576, PUB.
 L. 6-483 AND PUB. L. 97-117, 33 U.S.C. 1251 ET.SEQ., AS
 AMENDED BY THE WQA OF 1987, P.L. 100-4, THE "ACT."
  
 #3 YOUR PROJECT LIES WITHIN THE MUNICIPAL SEPARATE
 STORM SEWER (MS4) SYSTEM. CHAPTER 62.302, F.A.C.
 EFFECTIVELY STATES THAT THE SITE IS NOT ALLOWED TO
 DISCHARGE ANY QUANTITY OF WATER THAT VIOLATES STATE
 WATER QUALITY STANDARDS. CITY ORDINANCE 3132-98,
 SECTION 32-18(A) STATES THAT IT IS A VIOLATION TO
 DISCHARGE ANYTHING EXCEPT STORM WATER INTO THE CITY'S
 MS4. THE CITY HAS THE AUTHORITY AND OBLIGATION TO
 ENFORCE THESE RESTRICTIONS.
  
 #4 THE PROJECT SHALL INCORPORATE STORMWATER BMP'S
 (STORMWATER BEST MANAGEMENT PRACTICES) SUFFICIENT TO
 SUPPORT PROJECT DURING AND AFTER CONSTRUCTION. YOU MAY
 REFER TO THE LINKS BELOW FOR GUIDANCE:
 HTTP://CFPUB.EPA.GOV/NPDES/STORMWATER/MENUOFBMPS/
 HTTP://WWW.DEP.STATE.FL.US/WATER/NONPOINT/DOCS/NONPOINT
 /BMP_BOOK_FINAL.PDF
  
 NOTE: THE AUTHORITY OF THE CITY TO REGULATE THE SITE IS
 DERIVED BY OBLIGATION FROM FLORIDA STATUTE AND
 ULTIMATELY FEDERAL REGULATION. FEDERAL REGULATION
 MANDATES STORMWATER MANAGEMENT PROVISIONS TO THE STATE
 OF FLORIDA FOR ANY WATER DISCHARGED FROM STATE WATERS
 INTO FEDERAL WATERS. IN TURN, THE STATE OF FLORIDA
 MANDATES STORMWATER MANAGEMENT PROVISIONS THROUGH THE
 WATER MANAGEMENT DISTRICTS TO COUNTIES AND
 MUNICIPALITIES AND THROUGH THE FLORIDA DEPARTMENT OF
 ENVIRONMENTAL PROTECTION'S MUNICIPAL SEPARATE SYSTEM
 (MS4) PERMITTING PROGRAM. THE CITY IS RESPONSIBLE FOR
 THE TOTAL CONTAMINANT AND POLLUTANT LOADING IN WATER
 DISCHARGED FROM CITY WATER BODIES TO STATE WATERS, THE
 TRIGGER FOR COMPLIANCE IS THE CITY'S DETERMINATION THAT
 A SITE HAS THE POTENTIAL TO INTRODUCE, OR IS ACTIVELY
 DISCHARGING, WATER THAT MAY ADVERSELY IMPACT OUR
 SYSTEM. FOR FURTHER INFORMATION REFER TO "WATERS OF THE
 UNITED STATES" 40 CFR 122.2.
  
 PLEASE KNOW THE CITY HAS THE AUTHORITY TO IMPOSE
 STORMWATER BMP'S ON THE ENTIRE SITE WITH OR WITHOUT THE
 PROGRESSION OF THE PROPOSED WORK. THE ABSENCE OF ANY
 STORMWATER BMP FOR THE SITE ALLOWS THE BOTH THE WATER
 VOLUME AND
 CONTAMINANT/POLLUTANT LOAD TO ENTER OUR SYSTEM
 UNTREATED.
  
 MANUEL JULIAN GONZALEZ
 CSD ENGINEERING REVIEW
 401 CLEMATIS STREET, 1ST FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  
  
  
  
  
  
  
  
  
  
  