| Plan Review Notes For Permit 11010133 |
| Permit Number |
11010133 |
|
| Review Stop |
B |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2011-01-11 17:09:42 | RE-ROOF BUILDING REVIEW SECOND CHECKLIST. | | | 2007 FBC WITH 2009 REVISIONS. | | | | | | 1- MEMBRANE ATTACHMENT: ENGINEER SPECIFIES 4"O.C. | | | FASTENER SPACING AT PERIMETER AND CORNER AREAS. | | | CALCULATIONS ON SECOND PAGE SUBMITTED SHOWS FASTENER | | | SPACING AT 3.6" AND 2.7" RESPECTIVELY. CALCULATIONS AND | | | MEMBRANE ATTACHMENT SPECIFICATION DON'T MATCH. ON THE | | | OTHER HAND ENGINEER TO SEE SEC. 4.2 OF RAS 137 FOR | | | MINIMUM FASTENER SEPARATION REQUIRED. REVISE AS | | | REQUIRED. | | | | | | 2- INSULATION ATTACHMENT: ENGINEER SPECIFIES 6 | | | FASTENERS AT PERIMETER AND 8 FASTENERS AT CORNER AREAS. | | | ACCORDING TO SEC. 9.1.2 OF RAS 117 ALL FRACTIONS SHALL | | | BE ROUNDED UP TO THE NEXT WHOLE NUMBER. NOT ROUNDED | | | DOWN. ALSO, REVISE EXPOSURE SHOWN ON SHEET 3. THIS | | | BUILDING IS IN EXPOSURE "C" NOT "B". AND CLARIFY WHERE | | | IS THE -45PSF MAXIMUM DESIGN PRESSURE FOR THE | | | INSULATION ATTACHMENT TAKEN FROM?. REVISE AS REQUIRED. | | | | | | | | | 3- FASTENERS WITHDRAWAL RESISTANCE TEST (TAS 105) WILL | | | BE REQUIRED FOR MECHANICALLY FASTENED ROOF COVERINGS. | | | SEC. 4.3 OF RAS 137. | | | | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561)805-6712 |
|