| Date |
Text |
| 2011-02-02 08:04:08 | PERMIT NOT TO BE ISSUED PER JORGE ALVA, P.E. UNTIL HE |
| | HAS HAD AN OPPORTUNITY TO REVIEW PLANS, COMMENTS, AND |
| | POSSIBLE PROVISO ITEMS |
| | |
| | |
| | ****PROVISOS**** |
| | ****REVISION REQUIRED PRIOR TO FIRST INSPECTION**** |
| | ****ISSUED AT CONTRACTOR'S RISK**** |
| | SAMANTHA HILL, BUILDING PLANS EXAMINER |
| | 561-805-6724 [email protected] |
| | FBC FLORIDA BUILDING CODE 2007 |
| | FBC R FLORIDA BUILDING CODE 2007 RESIDENTIAL |
| | |
| | |
| | 1. OWNER, CONTRACTOR, AND ARCHITECT UNDERSTAND AND |
| | ACKNOWLEDGE RESPONSIBILITY TO COMPLY WITH ALL OF FEMA'S |
| | NFIP REQUIREMENTS, CFR TITLE 44, PART 60, FOR NEW |
| | CONSTRUCTION (PROJECT IS SUBSTANTIAL IMPROVEMENT). |
| | |
| | 2. PROVIDE PRODUCT APPROVALS REQUIRED FOR SLIDING GLASS |
| | DOOR, EXTERIOR DOORS, FAC9B72. SUBMIT AS A REVISION |
| | PRIOR TO INSTALLATION. |
| | |
| | 2. FLOOD OPENINGS IN COMPLIANCE WITH NFIP REQUIREMENTS |
| | REQUIRED. SUBMIT A DETAIL AND A REVISED ELEVATION |
| | CERTIFICATE SHOWING COMPLIANCE. |
| | |
| | HTTP://WWW.FEMA.GOV/PLAN/PREVENT/FLOODPLAIN/NFIPKEYWORD |
| | S/SI.SHTM |
| | HTTP://WWW.FEMA.GOV/LIBRARY/VIEWRECORD.DO?ID=1579 |
| | |
| | 3. INCLUDE WALKWAY BETWEEN GARAGE AND HOUSE ELEVATION |
| | ON THE SURVEY, MINIMUM 7'6" REQUIRED. |
| | |
| | 4. SUBMIT A "CONSTRUCTION DRAWINGS" ELEVATION |
| | CERTIFICATE REVISED AS FOLLOWS: |
| | |
| | A. SEE A8 ON ELEVATION CERTIFICATE. PRIOR TO FINAL |
| | INSPECTION, A "FINISHED CONSTRUCTION" ELEVATION |
| | CERTIFICATE WHICH SHOWS COMPLIANCE WITH NFIP |
| | REQUIREMENTS IS REQUIRED. PROVIDE A DETAIL TO SHOW HOW |
| | COMPLIANCE IS PROPOSED. |
| | |
| | B. THE ELEVATION CERTIFICATE PROVIDED AT PERMIT |
| | APPLICATION IS FOR "FINISHED CONSTRUCTION." AS NEW |
| | CONSTRUCTION IS PROPOSED (NEW MECHANICAL EQUIPMENT AND |
| | SLAB, SUBSTANTIAL IMPROVEMENT), THREE ELEVATION |
| | CERTIFICATES WILL BE REQUIRED FOR THE RENOVATION; |
| | CONSTRUCTION DRAWINGS, BUILDING UNDER CONSTRUCTION, AND |
| | FINISHED CONSTRUCTION. PLEASE PROVIDE A REVISED |
| | ELEVATION CERTIFICATE, "CONSTRUCTION DRAWINGS." |
| | |
| | C. SEE INSTRUCTIONS, A5, WHEN LATITUDE AND LONGITUDE |
| | ARE PROVIDED BY A SURVEYOR, PROVIDE METHOD USED IN |
| | COMMENTS. |
| | |
| | D. ORIGINAL SIGNED AND SEALED DOCUMENTS REQUIRED, SEE |
| | ELEVATION CERTIFICATE INSTRUCTIONS. |
| | |
| | E. SEE C2 A, 6.7 FEET IS STATED AS "TOP OF BOTTOM FLOOR |
| | (INCLUDING BASEMENT, CRAWLSPACE, OR ENCLOSURE FLOOR)." |
| | I WAS UNABLE TO LOCATE THIS ELEVATION ON THE SURVEY. |
| | THIS ELEVATION CONFLICTS WITH ARCHITECT'S DETAIL FOR |
| | MECHANICAL DUCTWORK. IF NECESSARY, USE THE COMMENTS |
| | SECTION TO CLARIFY AND TO SHOW COMPLIANCE WITH NFIP |
| | REQUIREMENTS. OWNER AND ARCHITECT ACKNOWLEDGE |
| | RESPONSIBILITY FOR FLOOR (INCLUDING BOTTOM OF JOISTS) |
| | AND MECHANICAL EQUIPMENT (INCLUDING DUCTWORK) TO BE |
| | ABOVE 7'6". A REVISED ELEVATION CERTIFICATE TO BE |
| | SUBMITTED. |
| | |
| | 4. INCORPORATE THE DETAIL FOR DUCTWORK INTO THE PLAN. |
| | NEW MECHANICAL EQUIPMENT AND DUCTWORK SHOWN. PROPOSED |
| | ELEVATION IS TO BE INCLUDED ON THE ELEVATION |
| | CERTIFICATE AND ON THE PLAN, MUNICIPAL CODE 94-546(B). |
| | SEE ALSO |
| | HTTP://WWW.FEMA.GOV/PDF/FIMA/PBUFFD_CHAPTER_3.PDF FOR |
| | REQUIREMENTS FOR HVAC SYSTEMS. PLEASE REVISE MECHANICAL |
| | DETAILS TO INCLUDE ELEVATIONS TO SHOW COMPLIANCE WITH |
| | NFIP REQUIREMENTS. MECHANICAL PLAN TO BE SUBMITTED |
| | EITHER WITH THE MECHANICAL APPLICATION OR AS A |
| | REVISION. |
| | |
| | 5. UNDER STAIR STORAGE IS SHOWN. SHOW COMPLIANCE WITH |
| | FBC R311.2.2., UNDER STAIR PROTECTION (UNDERSIDE OF |
| | STAIR/CEILING OF STORAGE AREA). REVISE DETAIL. |
| | |
| | 6. PLEASE RESOLVE EXPIRED PERMITS ON THIS ADDRESS PRIOR |
| | TO JOB COMPLETION. |
| | |
| | |
| | |
| | |
| | |