| Plan Review Notes For Permit 10110159 |
| Permit Number |
10110159 |
|
| Review Stop |
B |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2011-01-28 17:16:43 | ***PROVISOS*** | | | | | | 1. PROVIDE ORIGINAL SOILS INVESTIGATION REPORT (PRIOR | | | TO ISSUANCE) | | | | | | 2. SUBMIT DOOR PRODUCT APPROVALS (METAL DOOR, METAL | | | LOUVERED DOOR) - REVISION REQUIRED. | | | | | | 3. SEPARATE ROOF PERMIT REQUIRED. THE FOLLOWING ROOF | | | PRODUCT APPROVALS WERE REVIEWED BY D.O.R.: | | | | | | NOA 08-0410.08, PAGE 17 | | | NOA 07-1217.01, PAGE 26-27 | | | NON HVHZ NOA 06-0713.03 | | | | | | SEPARATE PERMIT REQUIRED FOR ROOF. THE FOLLOWING | | | INFORMATION IS TO BE SUBMITTED WITH ROOF PERMIT | | | APPLICATION: | | | | | | COMPONENT & CLADDING DESIGN PRESSURES FOR ROOF (FLAT | | | AND PITCHED) | | | ALL DELEGATED ENGINEERING IS TO BE REVIEWED BY DESIGNER | | | OF RECORD PRIOR TO SUBMITTAL (E.KUONEN, PE OR | | | M.MANGONE, ARCHITECT) | | | FOR FLAT ROOFS, METHOD OF ATTACHMENT TO BE SELECTED | | | FROM APPROVED ASSEMBLY | | | FOR FLAT ROOFS, RAS117 CALCULATIONS PREPARED BY AN | | | ARCHITECT, ENGINEER, OR REGISTERED ROOF CONSULTANT FOR | | | ENHANCED FASTENING (SEE GENERAL LIMITATION #7) | | | FOR THE TILE ROOF, SELECT METHOD OF ATTACHMENT FROM | | | FRSA/TRI 07320 TO SHOW COMPLIANCE WITH UPLIFT | | | REQUIREMENTS | | | | | | 4. PROVIDE IMPACT FEE RECEIPT (PRIOR TO ISSUANCE) | | | | | | |
|