| Plan Review Notes For Permit 10080087 |
| Permit Number |
10080087 |
|
| Review Stop |
B |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2010-08-12 10:24:52 | ****PROVISO**** | | | ****REVISION REQUIRED**** | | | ****ISSUED AT CONTRACTOR'S RISK**** | | | | | | REVISE INSTALLATION SCHEDULE TO CORRECT THE FOLLOWING: | | | | | | 1. P2, CEILING/FLOOR MOUNT SECTION B REQUIRES A | | | DIFFERENT FASTENER THAN THE ONE SPECIFIED IN THE | | | INSTALLATION SCHEDULE. | | | | | | 2. "CB" SPECIFIED AS SUBSTRATE ON INSTALLATION | | | SCHEDULE, SEE P. 5. IF THE SUBSTRATE IS CONCRETE BLOCK, | | | YOU MUST USE MASONRY FASTENING. | | | | | | |
|