| Date |
Text |
| 2010-10-06 07:33:11 | ****PROVISOS**** |
| | ****REVISION REQUIRED**** |
| | ****ISSUED AT CONTRACTOR'S RISK**** |
| | |
| | SAMANTHA HILL, BUILDING PLANS EXAMINER |
| | 561-805-6724 [email protected] |
| | FBC FLORIDA BUILDING CODE 2007 |
| | FBC R FLORIDA BUILDING CODE 2007 RESIDENTIAL |
| | |
| | 1. CITY OF WEST PALM BEACH MUNICIPAL CODE 94-546(B), |
| | FIRST FLOOR TOP OF SLAB TO BE ELEVATED TO 7.5' NGVD |
| | WITH CONCRETE PER DISCUSSIONS WITH ARCHITECT, PROPOSED |
| | DETAIL DATED 9-21-10, AND ARCHITECT'S STATEMENT |
| | REGARDING FLOOD RESISTANCE. REVISE SHEET A1, A2, AND |
| | ANY OTHER AFFECTED SHEETS. |
| | |
| | 2. FAC9B72, PRODUCT APPROVALS REVIEWED BY DESIGNER OF |
| | RECORD REQUIRED FOR ALL COMPONENTS AND CLADDING AND |
| | STRUCTURAL COMPONENTS SUCH AS THE ROOF, SIDING, FRONT |
| | DOOR, GARAGE DOOR, HELICAL PIERS. THE ROOF PRODUCT |
| | APPROVAL MAY BE SUBMITTED WITH THE ROOF PERMIT AND WILL |
| | REQUIRE REVIEW AT THAT TIME. OTHER PRODUCT APPROVALS |
| | NOT INCLUDED IN THIS SUBMITTAL ARE TO BE SUBMITTED AS A |
| | REVISION PRIOR TO INSTALLATION. |
| | |
| | 3. PRIOR TO INSTALLATION, INVESTIGATE AND ADDRESS ANY |
| | POTENTIAL ISSUES WHICH MAY ARISE FROM DISSIMILAR METALS |
| | ON THE ROOF (METAL ROOF, COPPER FLASHING, ALUMINUM |
| | GUTTERS), R904.2. |
| | |
| | 4. SHEET A8, STUCCO TO BE < 5/8" OR ALLOW 6" FOR |
| | INSPECTION FOR TERMITES, FBC R704.1. |
| | |
| | 5. PROVIDE ORIGINAL SIGNED, SEALED SOILS INVESTIGATION |
| | REPORT AT INSPECTION. |
| | |
| | 6. ENGINEER TO PROVIDE A LETTER OR REVISE THE PLAN TO |
| | CONFIRM THAT THE DESIGN CONFORMS TO THE REQUIREMENT OF |
| | FBC R301.2.1.4.3(2), "ROOF SHEATHING UPLIFT AND |
| | ROOF-TO-WALL UPLIFT LOADS SHALL BE INCREASED BY 20 |
| | PERCENT." |
| | |
| | 7. SUBMIT A REVISED, CORRECTED ELEVATION CERTIFICATE |
| | (DISCUSSED WITH CHRIS, COMPASS SURVEYING). THE REVISED |
| | "CONSTRUCTION DRAWINGS" ELEVATION CERTIFICATE IS TO BE |
| | SUBMITTED WITH THE REVISION PRIOR TO CONCRETE POUR. |
| | |
| | 8. MECHANICAL PLANS REQUIRED WITH SUBMISSION OF |
| | MECHANICAL PERMIT. MECHANICAL PLANS TO INCLUDE PROPOSED |
| | ELEVATION OF NEW AND EXISTING EQUIPMENT. |
| | |
| | |
| | |
| | |