| Plan Review Notes For Permit 10070313 |
| Permit Number |
10070313 |
|
| Review Stop |
FIRE |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2010-07-23 13:18:49 | *****DENIED***** | | | | | | 1) LOSS OF POWER TO THE PART OF THE ACCESS CONTROL | | | SYSTEM THAT LOCKS THE FRONT DOORS SHALL AUTOMATICALLY | | | UNLOCK THE DOORS IN THE DIRECTION OF EGRESS. | | | 2) THE MANUAL DOOR RELEASE DEVICE SHALL BE UNOBSTRUCTED | | | AND READ, ???PUSH TO EXIT???. WHEN PUSHED, THE MANUAL | | | RELEASE DEVICE SHALL RESULT IN DIRECT INTERRUPTION OF | | | POWER TO THE LOCK-INDEPENDENT OF THE ACCESS CONTROL | | | SYSTEM ELECTRONICS-AND THE DOORS SHALL REMAIN UNLOCKED | | | FOR NOT LESS THAN 30 SECONDS. | | | 3) ACTIVATION OF THE BUILDING FIRE DETECTION SYSTEM OR | | | SIGNALING SYSTEM SHALL AUTOMATICALLY UNLOCK THE DOORS | | | IN THE DIRECTION OF EGRESS. | | | | | | MIKE CARSILLO, BATTALION CHIEF | | | & WESLEY JOLIN | | | FIRE PLAN REVIEW | | | 561-805-6730 | | | |
|