| 2010-05-25 13:06:26 | FBC PLUMBING 2007 |
| | REVIEW #1 DENIED |
| | |
| | 1. FBC 106.3.5.1.3 - SANITARY AND WATER PIPE RISER |
| | DIAGRAMS REQUIRED. |
| | |
| | 2. GAS PIPE CAN NOT BE APPROVED WITHOUT THE REQUIRED |
| | INFORMATION. |
| | THIS INFORMATION MAY BE SUBMITTED WITH THE GAS |
| | CONTRACTORS APPLICATION FOR PERMIT: |
| | |
| | 1. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS ALL |
| | CUT SECTIONS OF PIPE AND CORRESPONDING LENGTHS PER |
| | FBC-2007 FUEL GAS. |
| | 2. SHOW TYPE OF PIPING MATERIAL BEING INSTALLED, ALL |
| | PIPE SIZES, AND THE EDH NUMBER OF CORRUGATED STAINLESS |
| | STEEL TUBING FOR EACH PIPE SIZE IF BEING USED. |
| | 3. TYPE OF GAS, (LP OR NATURAL). |
| | 4. BTU LOAD OF EACH APPLIANCE AND THE TOTAL BTU LOAD ON |
| | THE SYSTEM. REFER TO THE FBC-2007 FUEL GAS SECS. 401.8 |
| | THRU 402.6.1 AND TABLES 402.4(1) THRU 402.4(35) |
| | 5. SHOW THE DISTANCE FROM THE POINT OF DELIVERY, |
| | (METER), TO THE MOST REMOTE OUTLET IN THE BUILDING |
| | AND/OR SYSTEM PER THE FBC-2007 FUEL GAS APPENDIX A ??? |
| | USE OF CAPACITY SECTION A.3.1(4) |
| | 6. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE |
| | FBC-2007 FUEL GAS CODE SEC. 304 |
| | 7. INDICATE THE DELIVERY PRESSURE (PSI) PER FBC-2007 |
| | FUEL GAS SEC. 402.2. IF NATURAL GAS SPECIFY .5 PSI OR 2 |
| | PSI. |
| | 8. SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE AND |
| | TERMINATION OF THE GAS VENTS PER FBC-2007 FUEL GAS CODE |
| | SEC. 502 THRU 505. |
| | 9. SUBMIT MANUFACTURE SHEETS FOR ALL GAS EQUIPMENT TO |
| | VERIFY COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND |
| | FBC-2007 FUEL GAS SEC. 402.2 |
| | 10. CLEARLY SHOW THE LOCATION AND CAPACITY OF LP |
| | TANK(S), TYPE OF TANK (DOT OR ASME), THE DISTANCE OF |
| | THE TANK FROM THE BUILDING AND ADJACENT PROPERTY LINES |
| | THE DISTANCE OF THE TANK FROM ALL SOURCES OF IGNITION, |
| | OTHER CONTAINERS, BUILDINGS, AND THE LOCATION OF ANY |
| | BUILDING OPENINGS BELOW THE RELIEF VALVE OF THE TANK |
| | PER NFPA 58, TABLE 3-2.2.2. |
| | 11. CLEARLY INDICATE ON THE PLAN IF THE LP TANK IS |
| | ABOVE OR BELOW GROUND, AND SHOW REQUIRED PROTECTION OF |
| | THE TANK AND APPURTENANCES PER NFPA 58. IF THE TANK IS |
| | BELOW GROUND THE CONTAINER SHALL BE SECURELY ANCHORED |
| | PER NFPA 58 SECTION 3-2.2.7(H). |
| | 12. EMERGENCY HOOD SHUT DOWN SHUT OFF VALVE TO BE BELOW |
| | CEILING. MANUAL SHUT OFF VALVE TO BE UPSTREAM. UNION TO |
| | BE DOWN STREAM OF MANUAL VALVE. |
| | |
| | REVIEW BY LARRY WAGNER |
| | CHIEF PLUMBING INSPECTOR |
| | (561) 805-6692 |
| | FAX (561) 653-2692 |
| | E-MAIL [email protected] |
| | |