| Date |
Text |
| 2010-06-08 14:31:08 | 2007 FBC W/2009 REVISIONS |
| | ADDITION AND REMODEL |
| | |
| | DENIED BY BUILDING |
| | |
| | 1) THE PROJECT IS LOCATED IN AN A5 FLOOD ZONE WITH A |
| | BASE FLOOD ELEVATION OF 7 FEET. THE CITY OF WEST PALM |
| | BEACH MUNICIPAL CODE ARTICLE XVII SECTION 94-546 |
| | REQUIRES ALL NEW RESIDENTIAL CONSTRUCTION OR |
| | SUBSTANTIAL IMPROVEMENT OF ANY EXISTING RESIDENTIAL |
| | STRUCTURE TO HAVE THE LOWEST FLOOR ELEVATED TO SIX |
| | INCHES ABOVE THE BASE FLOOD ELEVATION. THIS REQUIREMENT |
| | ALSO APPLIES TO ALL SYSTEMS THAT SUPPLY THE STRUCTURE |
| | SUCH AS A/C EQUIPMENT. PROVIDE ELEVATIONS ON DRAWINGS |
| | THAT SHOW COMPLIANCE. |
| | |
| | 2) PROVIDE TWO COPIES OF A SURVEY. |
| | |
| | 3) THE STRUCTURE IS LOCATED IN EXPOSURE CATEGORY C AND |
| | WITHIN 600 FEET OF THE INTRACOASTAL WATERWAY. SECTION |
| | FBC R301.2.1.4.3 (2) OF THE 2009 REVISIONS TO THE 2007 |
| | FBC REQUIRES THE ROOF SHEATHING UPLIFT AND THE ROOF TO |
| | WALL UPLIFT LOADS TO BE INCREASED BY 20 PERCENT. SHOW |
| | COMPLIANCE. |
| | |
| | 4) THE PLANS WILL BE REQUIRED TO BE REVIEWED BY PALM |
| | BEACH COUNTY FOR IMPACT FEES AND A COPY OF THE PAID |
| | RECEIPT SUBMITTED BEFORE THE PERMIT IS ISSUED. |
| | |
| | 5) THERE HAVE BEEN SOME HANDWRITTEN CHANGES MADE TO |
| | SHEETS A101 AND A103 OF THE PLANS. HANDWRITTEN CHANGES |
| | TO SIGNED AND SEALED PLANS ARE NOT ALLOWED EXCEPT BY |
| | THE ARCHITECT OR ENGINEER. FS 471 AND 481. |
| | |
| | 6) PLEASE UPDATE THE CODE EDITION ON SHEETS S-0 AND S-4 |
| | TO THE 2007 FBC W/2009 REVISIONS AND ASCE 7-05. ALSO |
| | SPECIFY THE 2005 EDITIONS OF ACI 318 AND 530 PER |
| | CHAPTER 43 OF FBC RESIDENTIAL. |
| | |
| | 7) COORDINATE THE REVISED ARCHITECTURAL DIMENSIONS OF |
| | THE PORCH ADDITION WITH THE STRUCTURAL DRAWINGS. |
| | |
| | 8) SHOW COMPLIANCE WITH FBC R320.7 WHICH REQUIRES |
| | GUTTERS WITH DOWNSPOUTS AT THE NEW PORCH ADDITION WITH |
| | EAVES OF LESS THAN 6 INCHES OF HORIZONTAL PROJECTION. |
| | |
| | 9) PLEASE CORRECT THE WINDOW SCHEDULE ID MARKS ON A103. |
| | THEY SHOULD BE W01 AND W02. |
| | |
| | 10) THE WINDOW AND DOOR PRESSURES ON S-4 APPEAR TO BE |
| | LOW. PLEASE REVIEW AND PROVIDE CALCULATIONS. |
| | |
| | 11) SUBMIT TWO COPIES OF THE MANUFACTURER'S |
| | SPECIFICATIONS OR EVALUATION REPORTS FOR THE SPRAY FOAM |
| | INSULATION. |
| | |
| | 12) SUBMIT TWO COPIES OF PRODUCT APPROVALS FOR THE |
| | STRUCTURAL MULLIONS AS REQUIRED BY DCA RULE 9B-72. |
| | |
| | 13) PLEASE SPECIFY THE APPROVED ASSEMBLY, FASTENING |
| | OPTION AND THE DESIGN PRESSURE FOR THE TAMKO MODIFIED |
| | ROOF SYSTEM. SUBMIT TWO COPIES OF RAS 117 CALCULATIONS |
| | FOR ENHANCED UPLIFT AT THE PERIMETER AND CORNERS AS |
| | REQUIRED BY THE GENERAL LIMITATIONS ON PAGE 18 OF THE |
| | NOA. |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)805-6714 |
| | [email protected] |