| 2010-06-30 17:18:16 | RESIDENTIAL (R3) REPAIRS/ ADDITION BUILDING REVIEW |
| | CHECKLIST. |
| | 2007 FBC WITH 2009 REVISIONS. |
| | |
| | 1- A) PER DISCUSSION WITH BUILDING OFFICIAL, CONTRACTOR |
| | TO PROVIDE SIGNED CONSTRUCTION CONTRACT SHOWING FEE |
| | BREAKDOWN FOR EACH SCOPE OF WORK TO BE PERFORMED. EG: |
| | FEES TO RECONSTRUCT EXISTING FLORIDA ROOM AND TO |
| | REPLACE ROOF AS CITED ON THE HEALTH AND SAFETY |
| | VIOLATION. AND, FEES FOR THE PROPOSED IMPROVEMENTS |
| | (REPLACE DOORS, WINDOWS, BATHTUB, ETC.). |
| | |
| | ***NOTE: PLEASE MAKE SURE NUMBERS SHOWN ON CONTRACT |
| | MATCH NUMBERS SHOWN ON PERMIT APPLICATION. |
| | |
| | 2- A) PRODUCT APPROVAL FOR STEEL DOOR NOA 08-1015.05 IS |
| | MISSING THE DRAWINGS. PROVIDE THE DRAWINGS. |
| | B) CLARIFY IF USING STEEL DOOR NOA 08-0208.07 OR NOT. |
| | ENGINEER OF RECORD DIDN'T LIST THIS NOA AS PART OF THE |
| | REVIEWED PRODUCT APPROVALS. |
| | |
| | 3- ROOFING PRODUCT APPROVAL NOA 07-0802.09: CLEARLY |
| | MARK WHICH APPROVED SYSTEM IS GOING TO BE USED TO |
| | VERIFY COMPLIANCE WITH THE DESIGN PRESSURES OF SEC. |
| | R301 OF 2007 FLORIDA RESIDENTIAL CODE. |
| | |
| | 4- STORM SHUTTERS: INFORMATION SHOWN ON SHUTTER |
| | MOUNTING DETAIL ON ENGINEER'S DRAWING #1 DOESN'T MATCH |
| | INFORMATION SHOWN ON THE SHUTTERS INSTALLATION |
| | SCHEDULE. COORDINATE INFORMATION TO MATCH. EG: REVISE |
| | THE DESIGN PRESSURES TO MATCH DESIGN PRESSURES SHOWN ON |
| | DRAWING #2. REVISE THE MINIMUM EDGE DISTANCE TO MATCH |
| | ALSO. |
| | |
| | 5- PROVIDE RECORDED NOTICE OF COMMENCEMENT. SEC. 713.13 |
| | FLORIDA STATUTE. |
| | ***NOTE: THIS MAY BE RECORDED AT TIME OF PERMIT PICK |
| | UP. |
| | |
| | 6- ENERGY CALCULATIONS SUBMITTED: |
| | A) NEED TO PROVIDE CURRENT REVISED FORM. USE FORM |
| | 1100B-08 NOT 1100B-07. |
| | B) COMPLETE ALL THE INFORMATION ON TOP OF FORM |
| | INCLUDING BUILDER AND OWNER INFORMATION. |
| | C) REVISE ITEM #8. SEE PLANS FOR TOTAL SLAB ON GRADE |
| | LINEAR FEET. 24 LINEAR FEET IS INCORRECT. |
| | |
| | 7- TRUSS PACKAGE SUBMITTED: |
| | A) TRUSSES NEED TO BE REVISED FOR EXPOSURE "C", NOT |
| | EXPOSURE "B". REVISE AS REQUIRED. SEE PLANS. |
| | |
| | B) TRUSS PACKAGE IS NOT COMPLYING WITH SEC F.A.C. |
| | CHAPTER 61G15-31.003. MISSING THE TRUSS ENGINEER |
| | INFORMATION ON EACH SHEET. |
| | |
| | C) CLARIFY WHY TRUSS ENGINEER SIGNED AND SEALED |
| | DOCUMENTS ON 12/13/10? |
| | |
| | D) ENGINEER OF RECORD TO REVIEW AND APPROVE TRUSS |
| | PACKAGE PRIOR TO SUBMITTAL TO THIS OFFICE. |
| | |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |