| Date |
Text |
| 2010-04-29 15:28:52 | REVIEW #: 1ST |
| | ACTION: DENIED |
| | |
| | FBC 2007 CODE FAMILY W/ 2009 SUPPLEMENTS |
| | FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH |
| | |
| | 1. SCOPE OF WORK NOT CLEAR. THE APPLICATION STATES |
| | ???REINSTALL A PAINT MIX ROOM AT NEW LOCATION,??? BUT I |
| | WAS UNABLE TO FIND RECORD OF A PAINT MIXING ROOM AT |
| | THIS ADDRESS. FBC106. PLANS SHOW A NEW PAINT BOOTH. |
| | PROJECT DESCRIPTION SHOULD BE CONSISTENT WITH PLANS. |
| | |
| | 2. PROVIDE A SITE PLAN WHICH SHOWS BUILDING IN RELATION |
| | TO THE LOT LINES; SEE EXHAUST REQUIREMENTS, FBC M501.2, |
| | FBC M501.2.1. |
| | |
| | 3. SHOW THE DISTANCE BETWEEN THE EXHAUST AND INTAKE, |
| | FBC M501.2.1. |
| | |
| | 4. FBC M607.5, EXHAUST THROUGH A 2 HOUR EXTERIOR WALL |
| | IS SHOWN. PLEASE ADDRESS. |
| | |
| | 5. CODE INFORMATION PROVIDES INFORMATION REGARDING |
| | AMOUNTS OF PAINT PERMITTED WITHIN 6FT OF THE SPRAY |
| | AREA. PLEASE EXPLAIN, WHERE IS THE SPRAY AREA? WHERE |
| | WILL THE PAINT BE STORED, AND IN WHAT QUANTITIES, FBC |
| | M502.8.1? SEE FBC M 502.7, PAINT SPRAY REQUIREMENTS, IF |
| | THIS IS EXISTING, HOW DO EXISTING EXHAUST AND INTAKE |
| | OPENINGS AFFECT THE PROPOSED OPENINGS? |
| | |
| | 6. A 2 HOUR INTERIOR WALL IS SHOWN, IS THIS EXISTING OR |
| | PROPOSED? FBC 106. |
| | |
| | 7. A 2 HR FIRE RATED WALL IS SHOWN WITH NO DOOR, IS |
| | THIS CORRECT? A 24X24 OPENING IS SHOWN, PRESUMABLY FOR |
| | MAKEUP AIR. A DOOR WOULD INHIBIT THE FLOW OF MAKEUP |
| | AIR, BUT AN UNPROTECTED DOOR SIZED OPENING WOULD AFFECT |
| | THE FIRE RESISTANCE OF THE 2 HOUR WALL. PLEASE REVISE |
| | PLAN TO SHOW COMPLIANCE WITH FBC M502.9.5.4, MAKEUP |
| | AIR. |
| | |
| | IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: |
| | RONALD J. REGUEIRO |
| | 561.805.6719 |
| | [email protected] |