| Date |
Text |
| 2010-04-05 16:12:21 | LANDSCAPE REVIEW FAILED*** |
| | |
| | PLEASE RESPOND TO REVIEW COMMENTS IN WRITTEN FORMAT. |
| | |
| | 1. PURSUANT TO SECTION 94-445 (4) (G) (3) (II), IN ALL |
| | AREAS THAT ARE TO BE PLANTED IN A CULTIVATED LANDSCAPE, |
| | IRRIGATION SYSTEMS SHALL BE DESIGNED TO HAVE 120 |
| | PERCENT COVERAGE. ONLY 100 PERCENT COVERAGE WAS |
| | INDICATED. |
| | |
| | 2, REPEAT COMMENT: PURSUANT TO SECTION 94-442 (C), PALM |
| | TREES MAY BE SUBSTITUTED FOR NOT MORE THAN 35 PERCENT |
| | OF THE SHADE OR FLOWERING TREES REQUIRED BY THIS |
| | ARTICLE. WHEN PALM TREES ARE SUBSTITUTED FOR SHADE |
| | TREES, TWO PALM TREES SHALL BE PROVIDED FOR EACH |
| | REQUIRED SHADE TREE. HOWEVER, PURSUANT TO SECTION |
| | 94-445 (4) (B), WHEN USING THIS SUBSTITUTION, A MINIMUM |
| | OF THREE PALM TREES PER CLUSTER IS REQUIRED. THE SINGLE |
| | ADONIDIA PALMS DO NOT MEET THIS REQUIREMENT. |
| | |
| | 3. THE PROPOSED POINCIANA TREE ALONG THE SOUTH |
| | PERIMETER OF THE SITE WILL BE TOO CLOSE TO OVERHEAD |
| | POWER LINES. THIS TREE SPECIES CANNOT BE PLANTED WITHIN |
| | 30 FEET OF OVER HEAD LINES. PLEASE CHANGE THE SPECIES |
| | TO COMPLY WITH FPL'S "PLANT THE RIGHT TREE IN THE RIGHT |
| | PLACE" PROGRAM. |
| | |
| | 3. THE LANDSCAPE CALCULATIONS ARE NOT COMPLETE. OPEN |
| | SPACE IS DETERMINED BY TAKING THE TOTAL LOT AREA AND |
| | DEDUCTING THE FOOTPRINT OF THE BUILDING. WHAT IS LEFT |
| | IS OPEN SPACE. PLEASE SHOW HOW YOU ARRIVED AT THE OPEN |
| | SPACE. |
| | |
| | 4. PURSUANT TO SECTION 94-445 (4) (E), HEDGES SHALL BE |
| | PLANTED AT LEAST 24 INCHES IN HEIGHT WITH |
| | TWO-TO-THREE-FOOT INTERVALS AT CENTER. THE PROPOSED |
| | SHRUBS DO NOT MEET THIS REQUIREMENT. |
| | |
| | 5. THE ONE EXISTING QUEEN PALM DOES NOT SEEM TO RELATE |
| | TO THE BALANCE OF THE PROPOSED LANDSCAPING. PERHAPS IT |
| | COULD BE RELOCATED ELSEWHERE ON OR OFF SITE. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT ROBERT |
| | KUSSNER @ (561) 822-1462. |