Plan Review Notes
Plan Review Notes For Permit 10030591
Permit Number 10030591
Review Stop FIRE
Sequence Number 1
Notes
Date Text
2010-04-01 15:57:45 
  
 6501 NORTH JOG ROAD
 PERMIT NUMBER 10030591
 "INTERIOR DEMO FOR UNIT 1 & 2 FOR SWA TEMPORARY ROOF
 HATCH WRITTEN SCOPE OF WORK.
  
  
 1. DEMOLITION, RENOVATION AND CONSTRUCTION TO COMPLY
 WITH NFPA 241.
  
 2. FIRE AND PARAMEDICAL ACCESS SHALL BE PROVIDED DURING
 THE CONSTRUCTION ACTIVITIES.
  
 3. DEBRIS SHALL BE REMOVED FROM THE SITE DAILY OR AS
 OFTEN AS NECESSARY.
  
 4. ALL FIRE PROTECTION SYSTEMS AND DEVICES SHALL REMAIN
 CLEAR AND UNOBSTRUCTED.
  
 5. ANY REQUIRED FIRE AND LIFE SAFETY SYSTEM THAT IS
 PLACED OUT OF SERVICE FOR MORE THAN FOUR HOURS IN A
 TWENTY FOUR HOUR PERIOD SHALL REQUIRE A FIRE WATCH OR
 THE BUILDING VACATED. ALL FIRE WATCHES MUST BE IN
 WRITING AND APPROVED BY THIS OFFICE. FIRE WATCH
 PERSONNEL SHALL HAVE NO OTHER DUTIES, MAINTAIN A LOG,
 AND BE RADIO OR CELLULAR TELEPHONE EQUIPPED TO REPORT
 EMERGENCIES.
  
 6. SEPARATE PLANS AND PERMITS REQUIRED FOR ANY
 MODIFICATIONS TO THE FIRE SPRINKLER OR FIRE ALARM
 SYSTEMS.
  
 7. ALL EXIT DOORS ARE TO REMAIN CLEAR AND UNOBSTRUCTED.
  
 8. ALL CUTTING AND WELDING OPERATIONS SHALL COMPLY WITH
 NFPA 51B.
  
 9. THE OCCUPANCY PORTIONS OF THIS PROJECT WILL BE
 REVIEWED UNDER CHAPTER 40, INDUSTRIAL OCCUPANCIES.
  
 10. ACCORDING TO SECTION 3.14. AREA DESCRIPTIONS, SOME
 NEW GAS PIPING INSTALLATIONS ARE EXPECTED TO OCCUR. GAS
 PIPING INSTALLATIONS SHALL BE REVIEWED, APPROVED, AND
 INSTALLED IN A SAFE MANNER IN ACCORDANCE WITH
 RECOGNIZED STANDARDS.
  
 11. ACCORDING TO SECTION 3.2.1 ROADS FOR AREA
 DESCRIPTIONS, THE TEMPORARY ROADS SHALL BE INSTALLED
 AND MAINTAINED EVEN IN INCLEMENT FOR FIRE RESCUE USE.
  
 12. IN SECTION 3.4.1 AREA DESCRIPTIONS, WHEN FIRE HOSE
 REELS ARE REMOVED, TEMPORARY MEASURES SHALL BE PROVIDED
 UNTIL SUCH TIME AS THEY CAN BE RE-INSTALLED.
  
 13. ALL FIRE ALARM SYSTEMS SHALL COMPLY WITH NFPA 72,
 2002 EDITION.
  
 14. ALL FIRE SPRINKLER SYSTEM WORK SHALL COMPLY WITH
 NFPA 13, 2002 EDITION.
  
 15. ALL PORTABLE FIRE EXTINGUISHERS SHALL BE PROPERLY
 SERVICE TAGGED.
  
 16. PLEASE EXPLAIN WHY THE BOILER BUILDING IS NOT FIRE
 SPRINKLER PROTECTED AS DESCRIBED IN SECTION H OF THE
 SCOPE OF WORK.
  
 17. ALL ELECTRICAL WORK TO COMPLY WITH NFPA 70, THE
 NATIONAL ELECTRICAL CODE.
  
 18. ALL NEW STRUCTURES AND BUILDINGS SHALL BE PROPERLY
 PERMITTED PRIOR TO COMMENCING WORK.
  
 19. THE NEW ADDITION DESCRIBED IN 3.10.2 SCOPE OF WORK
 SHALL BE REVIEWED BY THE CITY TO DETERMINE CODE
 COMPLIANCE.
  
 20. PLEASE DEFINE ANY FIRE RATED WALLS AND FIRESTOPPING
 METHODS PLANNED FOR THE PROJECT.
  
 22. ADEQUATE SAFETY MEASURES AND SIGNAGE SHALL BE
 INSTALLED TO PREVENT INJURIES OR DEATH AFTER THE HOLES
 ARE INSTALLED IN THE ROOF AS DESCRIBED IN SECTION
 3.15.3 IN THE SCOPE OF WORK.
  
 23. TEMPORARY BARRICADES OR OTHER MEASURES SHALL BE
 UTILIZED TO PREVENT ACCESS INTO UNSAFE OR UNAUTHORIZED
 AREAS DURING DEMOLITION .
  
 24. TEMPORARY EXIT ROUTES MAY NEED TO BE CONSIDERED AND
 UTILIZED DURING WORK ACTIVITIES.
  
 25. SHEET 182 MO 023 DOES NOT APPEAR TO PROVIDE ENOUGH
 CLARITY FOR REVIEW.
  
 26. ALL STORAGE OF FLAMMABLE AND COMBUSTIBLE LIQUIDS
 SHALL COMPLY WITH NFPA 30.
  
 27. CARE MUST BE TAKEN WHEN USING GASOLINE POWERED
 EQUIPMENT IN CONFINED SPACES TO PREVENT THE
 ACCUMULATION OF CARBON MONOXIDE (CO). CARBON MONOXIDE
 IS A COLORLESS, ODORLESS GAS WHICH IS FLAMMABLE IN THE
 PROPER CONCENTRATION. ADEQUATE VENTILATION SHALL BE
 PROVIDED.
  
 28. A COMPREHENSIVE FIRE SAFETY PROGRAM SHALL BE
 DEVELOPED AND MAINTAINED DURING THE COURSE OF THIS
 PROJECT. THIS PROGRAM SHALL BE SUBMITTED TO THIS OFFICE
 AS SOON AS POSSIBLE. PLEASE SEE NFPA 241.
  
 29. THESE PLANS PRIMARILY DEMONSTRATE ITEMS AND
 MATERIALS THAT WILL BE DEMOLISHED. PLEASE DESCRIBE
 METHODS OF DEMOLITION, STORAGE CONFIGURATIONS, ETC.
  
 30. THE KEY PLAN IS NOT VERY ILLUSTRATIVE OR
 INFORMATIONAL ON SOME SHEETS.
  
 31. PLEASE DESCRIBE OVERFIRE AIR PIPING SYSTEMS.
  
 32. IN SECTION 4.1.1 CODES, PLEASE THE FLORIDA FIRE
 PREVENTION CODE 2007 EDITION, NFPA 101 2006 AND NFPA 1,
 2006 EDITION.
  
 33. LIGHTING PROTECTION NFPA 780 THE STANDARD FOR THE
 INSTALLATION OF LIGHTNING PROTECTION SYSTEMS TO BE
 ADDED TO SECTION 4.2.15.
  
 34. PLEASE PROVIDE PROCEDURE FOR LOCKING AND TAGGING
 OUT SYSTEMS THAT INVOLVE ALL SYSTEMS.
  
 35. OVERALL SITE PLAN DOES NOT ILLUSTRATE ANY FIRE
 HYDRANTS, HOSE HOUSES, PROPOSED CRANE LOCATIONS,
 STORAGE OR STAGING AREAS.
  
  
 DENIED
  
  
 MIKE CARSILLO, BATTALION CHIEF
 BUREAU OF FIRE PREVENTION
 (561) 804-4724 PHONE
 (561) 804-4774 FAX


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved