| 2010-03-17 14:01:38 | 2007 FBC W/2009 REVISIONS |
| | ADDITION |
| | |
| | DENIED BY BUILDING |
| | |
| | 1) BASED ON FBC R301.2.1.4.3, THE STRUCTURE IS LOCATED |
| | IN EXPOSURE C AND THE PLANS SPECIFY EXPOSURE B. PLEASE |
| | CORRECT AND REVISE COMPONENT AND CLADDING PRESSURES TO |
| | REFLECT EXPOSURE C. |
| | |
| | 2) SPECIFY TERMITE PROTECTION AS REQUIRED BY FBC R320. |
| | |
| | 3) SUBMIT TWO SETS OF ENERGY CALCULATIONS AS REQUIRED |
| | BY FBC 13-101.2.2. |
| | |
| | 4) SUBMIT TWO COPIES OF PRODUCT APPROVALS FOR EXTERIOR |
| | FRENCH DOORS, WINDOWS, ROOFING MATERIALS, CONNECTORS |
| | AND STORM PANELS AS REQUIRED BY DCA RULE 9B-72. |
| | |
| | 5) IF STORM PANELS WILL BE INSTALLED, SUBMIT TWO COPIES |
| | OF A KEY PLAN AND INSTALLATION SCHEDULE FOR THEM. |
| | SPECIFY ANCHORS, SPACING, MOUNT TYPE, ETC. |
| | |
| | 6) THE DESIGNER OF RECORD FOR THE PROJECT IS REQUIRED |
| | TO REVIEW AND APPROVE THE PRODUCT APPROVALS IN WRITING. |
| | CITY AMENDMENTS 106.3.3 |
| | |
| | 7) SHOW COMPLIANCE WITH FBC R806 FOR ROOF VENTILATION. |
| | |
| | 8) SPECIFY THE EXTERIOR WALL SHEATHING THAT WILL BE |
| | INSTALLED. FBC R602.2.10.3 |
| | |
| | 9) SHOW COMPLIANCE WITH FBC R703.6.3 FOR THE REQUIRED |
| | BOND BREAK BETWEEN THE WATER BARRIER AND THE STUCCO. |
| | |
| | 10) SHOW COMPLIANCE WITH R703.6.2 AND ASTM C 1063 AND |
| | SPECIFY THE FOUNDATION WEEP SCREED AT THE BOTTOM OF THE |
| | FRAMED EXTERIOR WALL. |
| | |
| | 11) SPECIFY THE EXTERIOR WALL INSULATION ON THE PLANS. |
| | FBC 13-600 |
| | |
| | 12) THE VALUE OF THE PROPOSED WORK IS TOO LOW AND HAS |
| | BEEN ADJUSTED TO $ 38,298.00 BASED ON ICC BUILDING |
| | VALUATION DATA. ADDITIONAL PERMIT FEES ARE DUE. CITY |
| | AMENDMENTS 108.3 |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)805-6714 |
| | [email protected] |