| Plan Review Notes For Permit 10010346 |
| Permit Number |
10010346 |
|
| Review Stop |
ENG |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2010-02-02 11:01:41 | DRIVEWAY APPROVED, BUT WORK CAN NOT START WITHOUT | | | DRIVEWAY APPROACH PERMIT FROM CITY ENGINEERING | | | DEPARTMENT. | | | CONTACT WINDEL PALMER, PROJECT COORDINATOR FOR | | | ENGINEERING AT 494-1086 OR LINDA FRANCIS, SECRETARY AT | | | 494-1063. | | | PLAN WILL NEED TO SHOW DRIVEWAY APPOACH (THE AREA | | | BETWEEN THE STREET PAVING AND BACK OF SIDEWALK SHALL BE | | | BUILT TO WPB ENGINEERING STANDARDS, WHICH WILL BE | | | SUPPLIED WHEN PERMIT IS APPROVED. | | | SIDEWALK THE FULL WIDTH OF THE DRIVEWAY WILL NEED TO BE | | | REMOVED AND REPLACED WITH 6" THICK CONCRETE. |
|