| Date |
Text |
| 2010-01-27 09:02:18 | 2007 FBC W/2007 REVISIONS |
| | SALES OFFICE |
| | |
| | DENIED BY BUILDING |
| | |
| | 1) THE GARAGE IS REQUIRED TO BE CONVERTED BACK TO THE |
| | ORIGINAL CONDITION WHEN THE TIME ALLOTED BY ZONING FOR |
| | THE TEMPORARY SALES OFFICE HAS EXPIRED. |
| | |
| | 2) SPECIFY THE APPLICABLE CODE INFORMATION ON THE |
| | PLANS. |
| | |
| | 3) SPECIFY THE WIND DESIGN DATA ON THE PLANS AS |
| | REQUIRED BY FBC 1603.1. SPECIFY THE BASIC WINDSPEED, |
| | IMPORTANCE FACTOR, EXPOSURE, COMPONENT AND CLADDING |
| | PRESSURES, ETC. |
| | |
| | 4) SPECIFY THE HURRICANE STRAPS AND CONNECTORS THAT |
| | WILL BE USED ON THE EXTERIOR WOOD FRAME IN-FILL WALL AT |
| | THE GARAGE DOOR OPENING AND SUBMIT 2 COPIES OF PRODUCT |
| | APPROVALS FOR THEM AS REQUIRED BY DCA RULE 9B-72. |
| | |
| | 5) SUBMIT 2 COPIES OF PRODUCT APPROVALS FOR THE |
| | STRUCTURAL WINDOW MULLIONS AS REQUIRED BY DCA RULE |
| | 9B-72. |
| | |
| | 6) ELEVATION NOTE #2 ON SO-1 REFERENCE FBC |
| | 2510.5.1/2517.5.11. ACCORDING TO THE 2007 FBC THE FIRST |
| | SECTION IS NOT RELEVANT AND THE SECOND DOES NOT EXIST. |
| | PLEASE CORRECT. |
| | |
| | 7) THE SALES OFFICE IS REQUIRED TO BE EQUIPPED WITH A |
| | TOILET FACILITIES PER 2007 FBC PLUMBING SECTIONS 403.1, |
| | 403.2 AND 403.4. THE PLANS SHOW THAT THE DOOR FROM THE |
| | GARAGE (SALES OFFICE) TO THE DWELLING UNIT IS TO BE |
| | BLOCKED OFF. IF THE SALES OFFICE AREA IS SEPARATED FROM |
| | THE DWELLING UNIT, THEN A TOILET FACILITY IS REQUIRED |
| | IN THE SALES OFFICE. IN ORDER FOR THE TOILET ROOM IN |
| | THE DWELLING UNIT TO BE USED THE DOOR CAN NOT BE |
| | BLOCKED AND BECAUSE FBC 11-4.1.1(4) REQUIRES TEMPORARY |
| | STRUCTURES TO COMPLY WITH ACCESSIBILITY, THE TOILET |
| | ROOM IS REQUIRED TO BE ON AN ACCESSIBLE ROUTE PER |
| | 11-4.1.3 (11). |
| | |
| | 8) SUBMIT TWO COPIES OF A SITE PLAN WITH DETAILS |
| | SHOWING COMPLIANCE WITH FBC 11-4.1.2 (5) AND 11-4.6 FOR |
| | ACCESSIBLE PARKING REQUIREMENTS AND ACCESSIBLE ROUTES. |
| | |
| | 9) THE DOORS IN THE OFFICE AREA ARE REQUIRED TO COMPLY |
| | WITH FBC 11-4.13.6 FOR MANEUVERING CLEARANCES AND |
| | 11-4.13.9 FOR HARDWARE. |
| | |
| | 10) PROVIDE DETAILS OF PROPOSED DROPPED CEILING IN |
| | OFFICE AREA. SPECIFY HEIGHT, MATERIALS, AND STRUCTURAL |
| | DETAILS. |
| | |
| | PLEASE RESPOND TO REVIEW COMMENTS IN WRITING. |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)805-6714 |
| | [email protected] |