2010-01-04 14:17:10 
  
  
 THIS REVIEW WAS DONE UNDER THESE CURRENT CODE CYCLES:
  
 THE 2007 FLORIDA BUILDING CODE, 2009 REVISIONS, 2008
 NEC, 2004 FBC AS AMENDED, CHAPTER 1.AND FOUND
 NONCOMPLIANT WITH THE FOLLOWING
  
 1} THE CODE ARTICLES REFERENCED ON SHEET E1 ARE
 INCORRECT, SEE ABOVE FOR THE CORRECT CODES.
  
 2} THE RISER DIAGRAM ON SHEET E3 APPEARS TO HAVE THE
 GROUNDING ELECTRODE CONDUCTOR ATTACHED TO A GROUND
 BETWEEN THE CT AND THE TRANSFORMER. 250.24(A)(1)
 GENERAL THE CONNECTION SHALL BE MADE AT ANY ACCESSIBLE
 POINT FROM THE LOAD END OF THE SERVICE DROP OR SERVICE
 LATERAL TO AND INCLUDING THE TERMINAL OR BUS TO WHICH
 THE GROUNDED SERVICE CONDUCTOR IS CONNECTED AT THE
 SERVICE DISCONNECTING MEANS.
  
 3} THE 1600 AMP MCB MUST HAVE GROUND FAULT PROTECTION
 PER 230.95 GROUND-FAULT PROTECTION OF EQUIPMENT
 GROUND-FAULT PROTECTION OF EQUIPMENT SHALL BE PROVIDED
 FOR SOLIDLY GROUNDED WYE ELECTRICAL SERVICES OF MORE
 THAN 150 VOLTS TO GROUND BUT NOT EXCEEDING 600 VOLTS
 PHASE-TO-PHASE FOR EACH SERVICE DISCONNECT RATED 1000
 AMPERES OR MORE. THE GROUNDED CONDUCTOR FOR THE SOLIDLY
 GROUNDED WYE SYSTEM SHALL BE CONNECTED DIRECTLY TO
 GROUND WITHOUT INSERTING ANY RESISTOR OR IMPEDANCE
  
 4} THE OCP AND 1/0 CONDUCTORS ARE INCORRECT FOR THE
 112.5 KVA TRANSFORMER. SEE 450.5(A)(2) (125%). ALSO
 THERE ARE 4 CONDUCTORS LISTED AT THAT SIZE WHEN THERE
 SHOULD ONLY BE THREE AND A GROUNDING CONDUCTOR.
  
 5} THE ELECTRICAL CONTRACTOR NEEDS TO SIGN THE PERMIT
 APPLICATION UNDER "CONTRACTOR SIGNATURE PORTION ON THE
 BACK OF THE PERMIT.
  
 IF THERE ARE ANY QUESTIONS PLEASE CALL.
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW.