| 2009-12-23 10:43:14 | REVIEW #: 1ST (REVISION EXPANDING SCOPE TO INCLUDE |
| | MECH.) |
| | ACTION: DENIED |
| | |
| | FBC 2004 CODE FAMILY W/ 2005 AND 2006 SUPPLEMENTS |
| | FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH |
| | |
| | 1. PAGE 3.2M SHOWS A RETURN AIR GRILL IN THE KITCHEN. |
| | AS THIS SYSTEM IS NOT DEDICATED TO THE KITCHEN AREA, |
| | RETURN AIR FROM THE KITCHEN IS PROHIBITED IN ACCORDANCE |
| | WITH FBC-M 407.1. HOOD EXHAUST AND MAKE-UP AIR SYSTEMS |
| | SHALL BE BALANCED TO MAINTAIN PRESSURE DIFFERENTIAL |
| | REQUIREMENTS AS STATED IN FBC-B 13-409.1.ABC.3.6.1. |
| | |
| | 2. PAGE 3.2M SHOWS A TYPE B GRILL BEHIND THE BAR |
| | PROVIDING 200 CFM SUPPLY. BASED ON THE "CEILING OUTLET |
| | SCHEDULE," THIS GRILL IS CAPABLE OF PROVIDING A MAXIMUM |
| | 150 CFM. COORDINATE FLOOR PLANS TO FACILITATE A PROPER |
| | AIR BALANCE IN ACCORDANCE WITH FBC-M 603.1. |
| | |
| | 3. PAGE 3.2M AND 3.3M EACH CONTAIN NOTES DESCRIBING THE |
| | PROPOSED WORK AS BEING "AS-BUILT HVAC 04NOV09." PLEASE |
| | CLARIFY HOW AS-BUILT DRAWINGS ARE BEING PRODUCED PRIOR |
| | TO ISSUANCE OF A MECHANIACL PERMIT FOR THE PROPOSED |
| | SCOPE OF WORK. A PERMIT SHALL BE SECURED PRIOR TO THE |
| | COMMENCEMENT OF ANY REGULATED WORK IN ACCORDANCE WITH |
| | FBC-B 105.1. |
| | |
| | 4. PAGE 3.3M: RETURN AIR GRILL DESIGNATION AND CFM IS |
| | MISSING FOR RTU 4. PROVIDE MISSING INFORMATION IN |
| | ACCORDANCE WITH FBC-M 603.1. |
| | |
| | 5. PAGE 3.2M SHOWS THE 12.5 TON RTU 1 AS EXISTING WHILE |
| | THE "SCOPE OF WORK" NOTES ON PAGE 3.3M CALL FOR RTU 1 |
| | TO BE REPLACED WITH NEW. PLEASE COORDINATE NOTES AND |
| | FLOR PLANS TO ACCURATELY REFLECT THE PROPOSED SCOPE OF |
| | WORK IN ACCORDANCE WITH FBC-B 106.1. |
| | |
| | 6. NEW RTU 1 SHALL BE PROVIDED WITH A MOTORIZED DAMPER |
| | AND SHUTOFF DAMPER CONTROLS ON THE OUTSIDE AIR INTAKE |
| | PER FBC-B 13-409.1.ABC.3.3. |
| | |
| | 7. PAGE 3.3M SHOWS A 10" ROUND RETURN AIR TRANSFER DUCT |
| | FROM THE PREP/STORAGE ROOM. THIS TRANSFER ALSO CARRIES |
| | THE RETURN AIR FROM THE ADJACENT OFFICE. SIZE THIS |
| | TRANSFER DUCT TO MEET THE BALANCED RETURN EXCEPTIONS |
| | UNDER FBC-M 601.4 OR A FIELD TEST WILL BE REQUIRED |
| | PRIOR TO FINAL INSPECTION TO VERIFY PRESSURE |
| | DIFFERENTIAL OF 0.01 INCHES W/C. |
| | |
| | 8. SEPARATE PLANS AND PERMIT APPLICATION SHALL BE |
| | SUBMITTED FOR PIZZA OVEN HOOD SYSTEM. |
| | NOTE: ARE ANY PROVISIONS BEING MADE FOR |
| | MAKEUP/COMBUSTION AIR FOR THE NEW PIZZA OVEN? |
| | |