| 2009-12-22 11:22:44 | |
| | |
| | APPLICATION #09120136 ELECTRICAL PLAN REVIEW |
| | 1107 22ND STREET 12/22/09 |
| | WEST PALM BEACH, FL. |
| | |
| | |
| | THIS REVIEW WAS DONE UNDER THESE CURRENT CODE CYCLES: |
| | |
| | THE 2007 FLORIDA RESIDENTIAL BUILDING CODE, 2009 |
| | REVISIONS, 2008 NEC, 2004 FBC AS AMENDED, CHAPTER 1.AND |
| | FOUND NONCOMPLIANT WITH THE FOLLOWING: |
| | |
| | 1} SHEET A-1 ALL THE ???APPLICABLE CODES??? NOTED ARE |
| | FROM THE PREVIOUS CODE CYCLE, CORRECT SAME. |
| | |
| | 2} THE ARCHITECTURAL FIRM WHOSE TITLE BLOCK APPEARS ON |
| | THE PLANS, MUST SIGN AND SEAL THE PLAN PER 481.221(1) |
| | (B) FS. |
| | |
| | 3} PER 110.9 AND 110.10: OBTAIN THE AVAILABLE FAULT |
| | CURRENT AT THE UTILITY AND CALCULATE THE SAME AT THE |
| | EQUIPMENT. INDICATE THE AIC RATING FOR THE EQUIPMENT IS |
| | EQUAL TO OR GREATER THAN THE AVAILABLE FAULT. |
| | |
| | 4} AN INTERSYSTEM BONDING TERMINATION FOR CONNECTING |
| | INTERSYSTEM BONDING AND GROUNDING CONDUCTORS REQUIRED |
| | FOR OTHER SYSTEMS SHALL BE PROVIDED EXTERNAL TO |
| | ENCLOSURES AT THE SERVICE EQUIPMENT AND AT THE |
| | DISCONNECTING MEANS FOR ANY ADDITIONAL BUILDINGS OR |
| | STRUCTURES. 250.94, 2008 NEC. |
| | |
| | 5} NOTE #4 IN THE ???GENERAL NOTES??? SHEET E2.01 |
| | REFERENCES ARC FAULT PROTECTION FOR BEDROOMS. SEE |
| | 210.12, 2008 NEC TO CORRECT THE NOTE. |
| | |
| | NOTE: CHANGE IN THE 2008 NEC AN INTERSYSTEM BONDING |
| | TERMINATION FOR CONNECTING INTERSYSTEM BONDING AND |
| | GROUNDING CONDUCTORS REQUIRED FOR OTHER SYSTEMS SHALL |
| | BE PROVIDED EXTERNAL TO ENCLOSURES AT THE SERVICE |
| | EQUIPMENT AND AT THE DISCONNECTING MEANS FOR ANY |
| | ADDITIONAL BUILDINGS OR STRUCTURES. 250.94, 2008 NEC. |
| | |
| | |
| | BILL TROBAUGH |
| | ELECTRICAL PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | 561/805-6718 |
| | |