Plan Review Notes
Plan Review Notes For Permit 09090230
Permit Number 09090230
Review Stop ENG
Sequence Number 1
Notes
Date Text
2009-10-05 07:40:54PASSED WITH PROVIOS:
 DEAN LAUDERMILK, PROJECT COORDINATOR,
 OFFICE 494-1083, EMAIL [email protected]
 SHEET CU-01-03:
 1. LOCATION - THROUGH-OUT SHEET: CTN???S (2 AND 3???
 PVC) SHOWN ARE NOT DEFINED ON SHEET G-00-02. WHAT ARE
 THEY? SAME COMMENT HOLDS TRUE ON SHEET CU-01-03.
 2. LOCATION - C-4: WHERE IS THE WATER METER AT THE
 BACKFLOW PREVENTER? ALL PRODUCTION WATER IS SUPPOSED TO
 BE MONITORED. THE METER DOES NOT SHOW UP ON SHEET
 CD-01-02, DETAIL 7 EITHER.
 3. C-4: WHY DOES THE DEDICATED EYE WASH WATER LINE
 DISAPPEAR INTO THE METER PUMP BUILDING? IT SHOULD HAVE
 A TEE IN THE LINE INTO THE BUILDING FOR THE EYE WASH
 STATION INSIDE.
 SHEET D-02-02:
 1. LOCATION ??? A2: THE CHLORINE UNLOADING STATION IS
 20??? EAST OF THE GARAGE DOORS INTO THE EXISTING
 CHLORINE BUILDING. WHY WAS THIS LOCATION CHOSEN? THE
 PAVEMENT ALSO ENDS AT THE GARAGE DOORS. WHY NOT PLACE
 THE CHLORINE FILL STATION AT THE GARAGE DOORS SO THERE
 IS NOT TOO MUCH HOSE REELED OUT. AN EVEN BETTER
 LOCATION WOULD BE INSIDE THE BUILDING AND HAVE THE FILL
 STATION INSIDE THE CONTAINMENT STRUCTURE.
  