| 2009-08-25 11:25:17 | 2007 FBC W/2007 REVISIONS |
| | CHANGE OF OCCUPANCY FROM R2 TO R3 |
| | |
| | DENIED BY BUILDING |
| | |
| | 1) SPECIFY THE OCCUPANCY TYPE, TYPE OF CONSTRUCTION AND |
| | LEVEL OF ALTERATION ON THE PLANS. SEE FBC 302, FBC 602 |
| | AND FBC EXISTING BUILDING 401.4. |
| | |
| | 2) SPECIFY THE ENTIRE SCOPE OF WORK ON THE PLANS. |
| | |
| | 3) THE VALUE SPECIFIED FOR THE APPARENT SCOPE OF WORK |
| | IS LOW. PLEASE REVISE THE VALUE TO INCLUDE THE COSTS OF |
| | MATERIALS, LABOR, DESIGN, OVERHEAD AND PROFIT FOR ALL |
| | STRUCTURAL, . CITY AMENDMENTS *FBC 108.3 |
| | |
| | 4) THE STRUCTURE IS LOCATED IN AN A9 FLOOD ZONE. ANY |
| | NEW EQUIPMENT IS REQUIRED TO BE ABOVE THE ELEVATION OF |
| | 13' 6". |
| | |
| | 5) THE ENERGY CALCULATION FORMS ARE REQUIRED TO BE |
| | SIGNED AND DATED BY THE PREPARER AND THE OWNER/AGENT. |
| | FBC CHAPTER 13. |
| | |
| | 6) ON SHEET 3, THE ANSI/UL ONE HOUR WALL DETAIL FOR |
| | DESIGN NO. U404 IS INCORRECT. THIS DESIGN REQUIRES 20 |
| | GA. STEEL STUDS @ 16" O.C. WITH 3" MINERAL WOOL BATTS. |
| | PLEASE REVISE. SEE DESIGN NO. U432, WHICH IS FOR ONE |
| | HOUR NON-BEARING WALLS WITH 20 GA. STEEL STUDS @ 24" |
| | 0.C. AND ANY LISTED GLASS FIBER OR MINERAL WOOL |
| | INSULATION. |
| | |
| | 7) THE ONE HOUR FIRE WALL DETAIL ALSO SPECIFIES R-19 |
| | INSULATION IN A NOMINAL 4" WALL. PLEASE REVISE TO |
| | INSULATION THAT WILL CORRECTLY FIT IN THE WALL. |
| | |
| | 8) SUBMIT TWO COPIES OF A KEY PLAN AND INSTALLATION |
| | SCHEDULE FOR THE STORM PANELS. SPECIFY THE OPENING |
| | PRESSURES, SIZES, SPANS, MOUNT TYPE, ANCHOR TYPE, |
| | ANCHOR SPACING, EDGE DISTANCE, GLASS SEPARATION, ETC. |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)805-6714 |
| | [email protected] |